ROADMAP FOR THE ASSESSMENT OF MEGAPROJECTS (RAMP): FOUR CASES FROM LEBANON

机译:兆画图评估的路线图(斜坡):黎巴嫩四种病例

获取原文

摘要

The complexity of the different economic, social, political, and financial aspects of megaprojects raises the need for a well-defined and comprehensive Pre-Project Planning (PPP) process. This process is fundamental to minimize losses and unforeseen risks arising due to these various complexities. Although owner/developer companies invest a lot of time, money, and effort in PPP, many of these projects are obscured during or at the end of this phase. By examining a set of four megaprojects, this study identified the PPP activities needed by any megaproject to successfully proceed to the final full-fund authorization decision. The collected data from the four megaprojects helped develop a Roadmap for the Assessment of Megaprojects (RAMP). The RAMP includes seven tracks spanning legislative, urban planning, socio-political, technical, phasing, financial and economic, and management issues. It is a step-by-step tool that guides PPP professionals through an efficient, time-saving, and comprehensive PPP process until the final go/no-go decision is reached based on the previously attained decisions pertaining to the seven tracks.
机译:该大型项目的的不同的经济,社会,政治和经济方面的复杂性提出了明确和完善的售前,项目计划(PPP)进程的需要。这个过程就是从根本上减少因这些不同的复杂性造成的损失和不可预见的风险。尽管业主/开发公司投入大量的时间,金钱和精力PPP的,其中许多项目都在或在这个阶段结束模糊。通过检查组的四个大型项目,这项研究确定了任何大型项目成功进入最后全基金授权决策所需的PPP活动。从四个大型项目所收集的数据帮助制定一个路线图大型项目的评估(RAMP)。坡道包括七个轨道跨越法律,城市规划,社会的政治,技术,相位,金融,经济和管理等问题。这是一步一步的工具,指导PPP专业人士通过一个高效,省时,和全面的PPP过程,直到基于与七个轨道先前获得的决定达成最终走/不走的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号