The Criticality Report as a tool for time and cost critical factors analysis for renovation and recovery intervention in Italy

机译:作为意大利改造和恢复干预的时间和成本关键因素分析的工具。意大利的临界报告

获取原文

摘要

The paper presents a system of critical factors defined after four years observation and study. The system is oriented to a multiplicity of actors - involved at different levels of the building process in the evaluation and control of the time and costs of an intervention - such as project managers, designers, safety coordinators and contractors' technicians. The different factors dealt with by the paper have been sorted in main classes, in turn divided in subclasses in which the factors in question are explained. The advantage of having a table of preventive analysis (i.e. the Criticality Report) allows to evaluate with more reliability the time and costs of carrying out of an intervention before the tender, by reducing the contentious during the works and, above all, by avoiding accelerations or "inappropriate tricks" for the attainment of expected quality and safety that may become necessary in order to respect the contract "at any cost".
机译:本文介绍了四年观察和研究后定义的关键因素系统。该系统定向到多个演员 - 涉及在评估和控制干预的时间和成本的评估和控制方面的不同级别 - 例如项目经理,设计师,安全协调员和承包商技术人员。纸张处理的不同因素已在主要课程中排序,又分配在解释有问题因素的子类中。具有预防性分析表(即关键性报告)的优点允许通过更可靠的时间来评估在招标前进行干预的时间和成本,通过减少工程期间的争议,最重要的是避免加速或者为了实现预期的质量和安全性,以“以任何费用”尊重合同可能是必要的“不适当的伎俩”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号