-Decision-making is crucial in the industry as the industrial expert having a restriction to convey their experience to the management prior to the final decision-making(DM).Daily operation in the industry especially in the automotive environment a lot of DM is required.Industry issue such as making decision of sub-assembly parts and module production location is one of the industry problem.The objectives of this study to establish a method to measure the intuitive opinions and experiences of the industrial expert for the DM proposal.Simple qualitative measurement would benefit to engineer to make a proposal to the management with the quantitative result.Intuition of the expert would conveyed to the decision maker in the industry to reach a decision on the proposal.Based on the criteria,sub-criteria and alternatives established,the computation using analytical hierarchy process(AHP)methodology applied in this study.The result of alternative 3 is 0.399,which is the processes will be outsource at the local component manufacturer location and transport to the automotive carmaker.The weighted factor in conclusion achieved the consistency with a CR ≤ 0.1,which is 0.07.Alternative 3 agreed by all related party in the industry as the best option for sub-assembly process of parts and modules in order to meet local contents strategy.The AHP methodology proven for usage as the appropriate tool for decision making in the industry.
展开▼