首页> 外文会议>International Postgraduate Conference on Mechanical Engineering >Strategy for controlling surface runoff in kemuning river basin,Indonesia
【24h】

Strategy for controlling surface runoff in kemuning river basin,Indonesia

机译:印度尼西亚河宁河流域表面径流的战略

获取原文

摘要

Kemuning River flood every year and inundate the city of Sampang.Flood discharge is dominated by surface runoff The Sungai Kemuning River Basin(DAS)is mostly(77%)in the form of gardens,fields and rice fields.The control of surface runoff is done by land conservation method,with the combination of 3 methods,namely: Vegetative,Mechanical,and Constructive Method.Conservation of vegetative methods,it is advisable to plant Mango or water apple with a combination of elephant grass(Pennisetum purpureum cv.Mott)in the garden,polowijo and elephant grass in the fields,and Paddy and Polowijo(one of: corn,soybeans,beans)in the fields.Mango and water apple is a local plant,but it is recommended to be updated with more superior varieties to be more productive.Elephant Grass is a new variety that is suitable to be planted in the watershed area,and it is intended to increase the stock of livestock feed,both cattle and goats.Conservation of mechanical methods,in the form of: making of infiltration holes and bench terraces in the garden,improving the design of embankments in fields and fields.The height of the embankment is reminded from 30 cm to 40 cm so as to increase the depth of the puddle in the fields from 0 cm to 30 cm,and the paddy field from 15 cm to 30 cm.With a land area of 20,526,430,000 m2 and a rice field of 1,183,356,100,000 m2,an increase in rainwater storage capacity of 793,296 m3 is obtained.This is identical with the capacity of two large dams.Conservation of constructive methods in the form of wells in the fields and rice fields.Recess wells are made in fields and rice fields with the amount and distribution of 1 unit per 2500 m2.The well serves as a recharge well to accelerate the decrease in the height of the normal puddle in the fields and in the rice fields.The peak flood discharge rates on the seven Sub-watersheds after conservation of land,respectively from Sub-DAS 1 to 7 are: 55%;51%;50%;20%;67%;58%;56%.
机译:哥文宁河每年洪水淹没和城市Sampang.Flood排放已由地表径流双溪哥文宁河流域(DAS),保持大部分(77%)在花园,田野和大米等多个领域的控制形式为主的地表径流是通过土地保护法进行,用3种方法,即组合:营养,机械和无性方法建设性Method.Conservation,可取的是植物芒果或象草的组合水苹果(紫狼尾草cv.Mott)在花园里,polowijo和象草的领域,水稻和polowijo(之一:玉米,大豆,豆)在fields.Mango和水苹果是当地的工厂,但建议用更多的优良品种进行更新更productive.Elephant草是一种新的品种,是适合于种植在流域面积,并且它的目的是增加牲畜饲料的库存,这两个牛和机械方法goats.Conservation,在形式:制造浸润孔的S和在花园台地,提高堤防的设计中字段和堤岸等多个领域的高度为30厘米至40厘米提醒,以便从0厘米增加熔池的深度在字段到30厘米,和从15cm至30 cm.With20526430000平方米的土地面积和1,183,356,100,000平方米稻田,增加793296立方米的雨水储存能力的水田被obtained.This是具有两个大dams.Conservation的容量相同在在田野和稻fields.Recess井孔的形式建设性方法字段和稻田用的量和每2500 m2.The 1个单元的分布是由阱用作回灌井,以加速在高度的减小在田野和在节约土地后的七个子流域,分别从子DAS 1至7中的米饭等多个领域的洪水峰值放电速率正常熔池的是:55%; 51%; 50%; 20% ; 67%; 58%; 56%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号