首页> 外文会议>AiCARR International Congress >Performance evaluation of a building integrated photovoltaic (BIPV) system combined with a wastewater source heat pump (WWSHP) system
【24h】

Performance evaluation of a building integrated photovoltaic (BIPV) system combined with a wastewater source heat pump (WWSHP) system

机译:建筑集成光伏(BIPV)系统的性能评价与废水源热泵(WWSHP)系统相结合

获取原文
获取外文期刊封面目录资料

摘要

This paper deals with both energetic and exergetic performance assessments of two combined systems as a whole. The first one is a Building Integrated Photovoltaic (BIPV) system while the second one is a wastewater (WW) Source Heat Pump (WWSHP) system. Both systems were installed at Yasar University, Izmir, Turkey within the framework of EU/FP7 and the Scientific and Technological Research Council of Turkey (TUBITAK) funded projects, respectively. The BIPV system was commissioned on 8 February 2016 and has been successfully operated since then while the WWSHP system was put into operation in October 2014. The BIPV system has a total peak power of 7.44 kW and consists of a total of 48 Crystalline Silicon (c-Si) modules with a gap of 150 mm between the modules and the wall, and a peak power per PV unit of 155 Wp. The WWSHP system consists of three main subsystems, namely (i) a WW system, (ii) a WWSHP, and (iii) an end user system. Two systems considered have been separately operated while the measured values obtained from both systems have been recorded for performance assessment purposes. In this study, a combined system was conceptually formed and the performance of the whole system was evaluated using actual operational data and some assumptions made. Exergy efficiency values for the WWSHP system and the whole system were determined to be 72.23% and 64.98% on product/fuel basis, while their functional exergy efficiencies are obtained to be 20.93% and 11.82%, respectively. It may be concluded that the methodology presented here will be very beneficial to those dealing with the design and performance analysis and evaluation of BIPV and WWHP systems.
机译:本文有两个系统相结合既充满活力和火用绩效评估作为一个整体的交易。第一个是一个光伏建筑一体化(BIPV)系统,而第二个是一个废水(WW)源热泵(WWSHP)系统。两个系统均在亚萨尔大学,土耳其伊兹密尔安装EU / FP7和科学与土耳其分别技术研究理事会(国家研究理事会)资助的项目,框架内。该BIPV系统是委托2016 2月8日,从那时起已成功操作,同时WWSHP系统投产十月2014年BIPV系统具有7.44千瓦的总峰值功率和由总共48晶体硅(C的-Si)同模块和壁,和每155 Wp的光伏单元的峰值功率之间150mm的间隙的模块。所述WWSHP系统包括三个主要的子系统,即(i)一个系统WW,(ⅱ)一个WWSHP,和(iii)的一个终端用户系统。两个系统都认为,同时从两个系统得到的测量值已被记录为业绩评估目的而单独操作。在这项研究中,一个联合系统是概念性地形成,并使用实际操作数据进行评价的整个系统的性能和一些假设制成。确定为WWSHP系统和整个系统的有效能效率值是72.23%,并且对产品/燃料基础64.98%,而获得它们的功能有效能效率分别为20.93%和11.82%。可以得出的结论是,这里介绍的方法将是那些与BIPV和WWHP系统的设计和性能分析和评估是非常有益的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号