Visual Data and Predictive Analytics for Proactive Project Controls on Construction Sites

机译:施工现场主动项目控制的视觉数据和预测分析

获取原文
获取外文期刊封面目录资料

摘要

This paper presents the theoretical foundation for a project controls system that improves understanding of how construction performance can be captured, communicated, and analyzed in form of a visual production system; predicts and effectively communicates the reliability of the weekly work plan and look-ahead schedules, supports root-cause assessment on plan failure at both project and task-levels; facilitates information flows; and decentralizes decision-making. Our model-driven system builds upon novel visual data analytics to map the current state of production in 4D (3D+time), compare to 4D BIM, and expose waste at both project and task-levels. Using predictive analytics and based on actual progress and productivity data, reliability in the future state of production is forecasted to highlight potential issues in a location-driven scheme and support collaborative decision making that eliminates root causes of waste. To evaluate the performance of our system, several case studies are conducted on real-world commercial building projects. It is shown that the developed system provides visual interfaces between people and information on and offsite, enables effective pull flows, decentralizes work tracking, facilitates in-process quality control and hand-overs among contractors, and most importantly transforms retroactive and task-driven workflows in contractor coordination meetings to proactive location-driven practices.
机译:本文介绍了项目控制系统的理论基础,提高了了解如何捕获施工性能,传播和分析视觉生产系统的形式;预测和有效地传达每周工作计划和期望的时间表的可靠性,支持对项目和任务级别的计划失败的根本原因评估;促进信息流动;并分散决策。我们的模型驱动系统在新颖的视觉数据分析时构建,以映射4D(3D +时间)的当前生产状态,与4D BIM进行比较,并在项目和任务级别曝光废物。使用预测分析和基于实际进展和生产力数据,预测未来生产状态的可靠性,以突出地点驱动方案中的潜在问题,并支持消除废物根本原因的协作决策。为了评估我们的系统表现,在现实世界的商业建筑项目中进行了几种案例研究。结果表明,发达的系统在人员和信息之间提供视觉界面,即开店,实现有效的拉动流,分散工作跟踪,促进承包商中的过程中的水质控制和手,最重要的是转换追溯和任务驱动的工作流程在承包商协调会议上,以积极主动驱动的做法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号