The Paroo Station lead mine, located in Western Australia and owned by LeadFX, has historically produced a lead flotation concentrate from a predominantly lead carbonate (cerussite) orebody. The shipment of the cerussite concentrate from the minesite to smelters is subject to strict environmental controls and high product handling, logistics, treatment and refining charges due to the concentrate containing 67% lead, the transport distance and the lack of intrinsic fuel value and by-product elements. LeadFX needed to implement an innovative solution in order to process the concentrate on-site, therefore reducing environmental risk and cost.InCoR Technologies, with SNC-Lavalin, has completed a Definitive Feasibility Study (DFS) for the construction and operation of a Hydrometallurgical Facility at Paroo Station, which will allow LeadFX to process the concentrate on site and produce LME grade lead metal ingots for shipment. The process technology, accessed via an exclusive license to InCoR Technologies from BASF SE and the University of British Columbia (and now exclusive sub-license to LeadFX Inc.), uses methane sulphonic acid as the lixiviant for leaching and electrowinning of lead. The feasibility study included a drill program and an extensive bench scale and pilot scale flotation and hydrometallurgical testwork and development program at ALS Global Metallurgical Services laboratories in Perth.The DFS concluded that the construction of the process plant was technically feasible and financially viable. Importantly, the construction of the Hydrometallurgical Facility will result in value added production of lead metal in Western Australia and significantly improved mine economics. The highlights of the study were: 15 year Mine life - a 3.3 times increase? 1.19 million tonnes contained lead in Ore Reserves (JORC 2012) - 2.5 times increase ? >85% conversion of Mineral Resources to Ore Reserves? Hydrometallurgical Facility capital cost estimate: US$151.1 million? Acid leaching, electro-winning and melting flowsheet to produce up to 70,000 tpa of lead metal ingots? Life of Mine C1 cash cost: US$1,254/t Pb (US$0.57/lb Pb)? NPV of US$191 to 303 million and IRR of 23.5 to 31.3%pa at long-term LME lead price of US$2,2502 to 2,575/t Pb (US$1.02 to 1.17/lb Pb)LeadFX is progressing to Front End Engineering Design (FEED), environmental permitting and financing and has a final investment decision target of Q3 of 2018.
机译:Parou Station Leadine位于西澳大利亚州和Leadfx拥有,历史地制作了来自主要铅碳酸盐(Cerussite)Orebody的铅浮选浓缩物。由于含有67%铅,运输距离和缺乏内在燃料价值的浓缩物,浓缩的环境控制和高产品处理,物流,治疗和精炼电荷的严格环境控制和高产品处理,物流,治疗和精炼费,以及 - 产品元素。 Leadfx需要实施创新的解决方案,以便在现场处理浓缩物,从而减少环境风险和成本。用SNC-LAVALIN进行环境风险和成本技术已经完成了一个明确的可行性研究(DFS),用于液压冶金设施的构建和运行在Parou Station,这将使Leadfx在现场生产浓缩物,并生产LME级铅金属锭进行装运。通过来自巴斯夫SE和不列颠哥伦比亚省大学(现在独家副许可证的Fabf Cx Inc.)通过专用许可进行的过程技术使用甲烷磺酸,作为铅的李敏,铅。该可行性研究包括钻探计划,并在珀斯的全球冶金服务实验室中广泛的长凳规模和飞行员浮标和助长冶金验证和发展计划.DFS的结论是,工艺厂的建设在技术上是可行的和经济上可行的。重要的是,湿法冶金设施的建设将导致西澳大利亚铅金属的增值生产,并显着改善矿山经济学。研究的亮点是:15年矿山生活 - 增加3.3倍?矿石储量1190万吨铅铅(2012年) - 增加2.5倍? > 85%将矿产资源转换为矿石储量?液压冶金设施资本成本估算:15110万美元?酸浸出,电赢和熔化的流量,产生多达70,000吨的铅金属锭?矿山寿命C1现金成本:US $ 1,254 / T PB(0.57美元/磅PB)吗? NPV为191亿美元至3.33亿美元,长期LME铅率为23.5至31.3%,达到2,575美元至2,575 / t PB(1.02至1.17 / LB PB)LeadFX正在进步到前端工程设计(饲料),环境允许和融资,并具有2018季度第三季度的最终投资决策目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号