首页> 外文会议>International Conference on Business and Management Research >Implementation of Benchmark Inventory Control in PT. X to Increase Sales Volume in ProQ Workshop as SMEs in Indonesia
【24h】

Implementation of Benchmark Inventory Control in PT. X to Increase Sales Volume in ProQ Workshop as SMEs in Indonesia

机译:PT中基准库存控制的实现。 X增加了印度尼西亚中小企业的Proq研讨会的销量

获取原文

摘要

This paper is written based on how a business coaching process can help SMEs improve which area need an improvement such as HR, finance, operational, or marketing section based on the personal experiences of the owner and based on the coach observations to the company. ProQ is an SME engaged in maintenance and repair services of motor vehicle air conditioner. In ProQ, there is no inventory control process; therefore, its operational activities arc disturbed. This paper is the result of applying inventory control for ProQ workshop through problem identification process, problem solving recommendations, and implementation of the recommendations. The step taken is to conduct a benchmarking process to PT. X which has run inventory control on a large scale and with a large inventory of spare parts. From the results of benchmarking, there are few steps that can be done by adapting the inventory control of PT. X, namely the importance of the existence of part-man and its SOPs, random sampling and stock operational activities are scheduled and have clear records and reports, and recording of the daily in and out of spare parts from the inventory which is well-organized and PT. X also has a classification of fast, slow, and non-moving inventory through the age of spare parts. By implementing the recommendation in ProQ, the inventory control in ProQ will be better.
机译:本文是基于业务流程的教练如何帮助中小企业提高写哪个区域需要根据业主的个人经验和基础上,教练观察到公司的发展,如人力资源,财务,经营,或营销部分。 ProQ是一家从事汽车空调维护和维修服务的中小企业。在ProQ中,没有库存控制过程;因此,其运营活动令人扰乱。本文是通过问题识别过程,问题解决方案和建议的实施来应用ProQ研讨会的库存控制的结果。所采取的步骤是对PT进行基准过程。 X在大规模上运行库存控制,并具有大量的备件库存。从基准测试结果,只需调整PT的库存控制即可完成几个步骤。 X,即零售部分及其SOP的重要性,随机抽样和股票运营活动计划,并有明确的记录和报告,以及从良好组织的库存中记录每日进出零配件和pt。 X还通过备件年龄快速,慢,不动库存的分类。通过在ProQ中实施建议,ProQ中的库存控制将更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号