首页> 外文会议>Annual convention of the indonesian petroleum association >FSO GAGAK RIMANG: IMPLEMENTATION OF A RISK BASED INTEGRITY MANAGEMENT PROGRAM
【24h】

FSO GAGAK RIMANG: IMPLEMENTATION OF A RISK BASED INTEGRITY MANAGEMENT PROGRAM

机译:FOSO生长RAUT:实施基于风险的完整性管理计划

获取原文
获取外文期刊封面目录资料

摘要

ExxonMobil Cepu Ltd (EMCL) operates Floating, Storage and Offloading (FSO) Gagak Rimang which was converted from a Very Large Crude Carrier (VLCC) M/T Chios (originally built in 1993). The converted hull and supporting structures have been upgraded to meet expected environmental and operational loads including remaining at the location, Tuban Sea, for 25 years, operating uninterrupted as an FSO without dry-dock or requiring major repair / maintenance work while on station. The FSO Gagak Rimang is a dual classification vessel (ABS and BKI). The FSO's cargo tanks store Banyu Urip's crude oil (~70 deg C) prior to transferring to buyer's vessel. A Risk-Based Inspection (RBI) program was developed for structural aspects of the FSO hull to ensure its integrity. The RBI program integrated a detailed structural analysis (strength and fatigue), with past operational performance (as M/T Chios) to understand the risk profile (quantitative and qualitative) and detennine a fit for purpose In-Service Inspection Program (ISIP). The RBI approach ensures inspection is proportionally focused on the systems and/or components which greatly contribute to the overall integrity of the facilities, while still meeting Class requirement. Additionally, it offers benefit to the operator by reducing personnel exposure to hazards associated with work execution, minimizing operational interruption and ultimately improving cost efficiency. FSO Gagak Rimang's RBI program was approved by Class in late 2016. Upon approval, a thorough execution plan was reviewed to address complexities such as confined space entry, heat stress management and simultaneous operations. One unique challenge to address when executing the RBI program is related to heat stress management. Due to the high temperature of crude (~60C) and radiant heat impacts, proper mitigations needed to be carried out to ensure personnel safety & health when conducting inspections inside crude oil and void tanks. The Thermal Work Limit (TWL) methodology was developed to determine the safe work environment based tank atmosphere ambient temperature and relative humidity. This TWL methodology permits a maximum sustainable metabolic rate that allows well-hydrated, acclimatized individuals to be maintained in a specific thermal environment, within a safe core body temperature. Through implementation of the TWL methodology, the first tank inspection campaign was safely executed in 2017 with all required inspection data for Class recertification captured.
机译:埃克森美孚CEPU有限公司(EMCL)操作浮动,储存和卸载(FSO)Gagak Rimang,该Gagak Rimang由一个非常大的原油载体(VLCC)M / T希俄斯(最初建于1993年)转换。转换的船体和支撑结构已升级以满足预期的环境和运营载荷,包括剩余的桶,巨大的桶,25年,因为没有干船坞的FSO而不间断地操作,或者在车站上需要重大修理/维护工作。 FSO Gagak Rimang是双重分类船只(ABS和BKI)。 FSO的货运坦克在转移到买方的船只之前储存Banyu Urip的原油(〜70℃)。基于风险的检查(RBI)计划是为FSO HULL的结构方面制定的,以确保其完整性。 RBI计划综合了详细的结构分析(强度和疲劳),具有过去的运营绩效(作为M / T希俄斯),以了解风险概况(定量和定性),并确定适合于在职式检查计划(ISIP)。 RBI方法确保检查按比例集中在大大贡献设施整体完整性的系统和/或组件上,同时仍然会满足课程要求。此外,它还向运营商提供福利,通过减少与工作执行相关的危险,最大限度地减少运营中断并最终提高成本效率。 FSO Gagak Rimang的RBI计划于2016年底批准。批准后,审查了彻底的执行计划,以满足受限空间进入,热压力管理和同步操作等复杂性。在执行RBI程序时解决一个独特的挑战与热应力管理有关。由于原油的高温(〜60℃)和辐射热撞击,需要进行适当的缓解,以确保在原油和空隙箱内进行检查时的人员安全和健康。开发了热工作限制(TWL)方法,以确定基于安全的工作环境的坦克气氛环境温度和相对湿度。该TWL方法允许最大可持续的代谢速率,允许在安全的核心体温下保持在特定热环境中的良好水合的适应性的个体。通过实施TWL方法,第一届坦克检验活动于2017年安全执行,捕获的所有必需的检查数据都有所需的类别重新认证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号