Implementation of first come first served in door leaf production scheduling

机译:首先实施首先是门叶生产调度

获取原文

摘要

In a production activity,optimum results can be obtained if all production activities in a good planning.Good planning can be done to make a scheduling.Scheduling as a decision-making process has an important role in various manufacturing and production systems and information processing environments.In this furniture industry each product goes through a production process with the same machine usage.The stages of processing the product using the same machine related to increase consumer demand and fluctuating indirectly causing accumulation and irregular product lead time.This condition certainly causes delivery delay of products to consumers.Therefore,a scheduling design is needed to minimize the total lead time in order to meet customer demands.The design is carried out using the First Come First Served method where the design was carried out based on the demand of consumer demand received.The results of the study using the FCFS method showsthat the makespan value is 2579,40 hours with the sequence of production product,namely job A-job B-job C-job D-job E-job F.Job sequence based on the demand in which the product first ordered will be done first.
机译:在生产活动中,如果良好规划中的所有生产活动,可以获得最佳结果。可以进行良好的规划,以便进行调度。作为决策过程在各种制造和生产系统和信息处理环境中具有重要作用。 。在这家家具行业中每种产品都经过生产过程,使用相同的机器使用。使用相同的机器处理产品的阶段,该产品与增加消费者需求增加,间接造成累积和不规则产品的流动性。此条件肯定会导致交付延迟消费者的产品。因此,需要调度设计来最小化总线时间,以满足客户需求。使用第一个来实现的设计是根据消费需求的需求进行设计收到。使用FCFS方法的研究结果显示Makespan值为2579,40小时这是生产产品的序列,即工作A-Job B-Job C-Job D-Job e-Job F.Job序列,首先将首次订购的产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号