首页> 外文会议>International Conference on Mechanical Engineering, Automation and Control Systems >Justification of process of loading coal onto face conveyors by auger heads of shearer-loader machines
【24h】

Justification of process of loading coal onto face conveyors by auger heads of shearer-loader machines

机译:用螺旋桨装载机螺旋头装载煤炭进入面部输送机的理由

获取原文
获取外文期刊封面目录资料

摘要

This paper analyzes the processes of removing coal from the area of its dislodging and loading the disintegrated mass onto face conveyors by auger heads of shearer-loader machines. The loading process is assumed to consist of four subprocesses: dislodging coal, removal of the disintegrated mass by auger blades from the crushing area, passive transportation of the disintegrated mass, and forming the load flow on the bearing surface of a face conveyor. Each of the considered subprocesses is different in its physical nature, the number of factors influencing it, and can be complex or multifactor. Possibilities of improving the efficiency of loading coal onto a face conveyor are addressed. The selected criteria of loading efficiency are load rate, specific energy consumption, and coal size reduction. Efficiency is improved by reducing the resistance to movement of the disintegrated mass during loading by increasing the area of the loading window section and the volume of the loading area on the conveyor, as well as by coordination of intensity of flows related to the considered processes in local areas.
机译:本文从它的松脱的区域除去煤和由采煤机型装载机机器的螺旋推运器头装载崩解质量到面输送机的工艺。假定加载过程由四个子过程:撞出煤,除去分解的质量的螺旋推运器由叶片从破碎区域,使分裂的质量的被动运输,以及形成工作面输送机的支承表面上的负载流量。每个所考虑的子过程的是在它的物理性质不同,的因素的数量影响它,并且可以是复杂或多因素。提高装煤的效率到工作面输送机的可能性得到解决。的装载效率所选择的标准是负载率,比能耗,和煤尺寸减小。效率是通过增加加载窗口部分的面积与输送机上的装载区域的体积装载期间减小电阻,以使分裂的质量的运动,因为改善以及通过与在所考虑的工艺流的强度的协调局部地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号