首页> 外文会议>International Conference on Sustainable Materials Processing and Manufacturing >Provisional Equations for Determining Leachate Leakage Rate through Composite Barriers from Compromised Geomembrane
【24h】

Provisional Equations for Determining Leachate Leakage Rate through Composite Barriers from Compromised Geomembrane

机译:用于通过损害土工膜的复合屏障确定渗滤液渗漏速率的临时方程

获取原文
获取外文期刊封面目录资料

摘要

From years ago to present date the equations available for determining the rate of leachate leakage through composite barriers from geomembrane (GM) failures necessitated the use of graphs to attain the value of one of the terms of the equations for the case where the leachate head is larger than the thickness of the low-permeability soil medium of the composite barrier. This work reveals that the terms requiring graphs can be expressed analytically, which shows a new set of equations that leads to an entirely analytical approach of determining the rate of leachate leakage through composite barriers. The provisional set of equations is principally beneficial when the leachate level is large as against the thickness of the low-permeability soil medium of the composite barrier. This is usually the case when the low-permeability soil medium allied with the GM to form a composite barrier is a geosynthetic clay liner (GCL). Whether the failure in the GM is small or large or where the leachate level on top of the barrier is large as against the thickness of the low-permeability soil layer of the composite system, a provisional equation can be used to determine the leakage rate through the system. Although in such a scenario, graphs are essential in attaining the value of one of the terms of the equations. Therefore, this paper shows that the graphs can be replaced by equations, which proceeds to the generation and utilization of an entirely analytical method of determining the rate of leachate leakage through a failed composite waste containment barrier, irrespective of the leachate level overlying the system.
机译:从几年前至今的日期,可用于确定渗滤液通过来自土工膜(GM)失败的渗滤液泄漏速率的方程需要使用曲线图来实现渗滤液头的情况的方程项之一的值大于复合屏障的低渗透土壤介质的厚度。这项工作揭示了需要图表的术语可以分析地表达,这示出了一种新的方程,导致通过复合屏障确定渗滤液泄漏速率的完全分析方法。当渗滤液水平较大时,临时等式的临时方程组主要是有益的,因为抵抗复合屏障的低渗透性土壤介质的厚度。通常是这种情况,当与GM均均匀形成复合屏障的低渗透性土壤介质是土工合成粘土衬里(GCL)。 GM中的失败是否小或大或者在屏障顶部的渗滤液水平很大,因为抵抗复合系统的低渗透性土壤层的厚度,可用于通过临时方程来确定泄漏率系统。虽然在这样的场景中,但是图表对于获得方程之一的值是必不可少的。因此,本文示出了图形可以由等式代替,该方程可以通过失败的复合废物容纳屏障确定渗滤液泄漏的完全分析方法的产生和利用,而不管覆盖系统的渗滤液水平如何。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号