Analysis Impact of Distributed Generation Injection to Profile of Voltage and Short-Circuit Fault in 20 kV Distribution Network System

机译:分布式发电喷射对20 kV配电网络系统电压和短路故障轮廓的影响

获取原文

摘要

This study was a case study in PT. PLN (Ltd.) APJ Bandung area with the subject taken was the installation of distributed generation (DG) on 20-kV distribution channels. The purpose of this study is to find out the effect of DG to the changes in voltage profile and three-phase short circuit fault in the 20-kV distribution system with load conditions considered to be balanced. The reason for this research is to know how far DG can improve the voltage profile of the channel and to what degree DG can increase the three-phase short circuit fault on each bus. The method used in this study was comparing the simulation results of power flow and short-circuit fault using ETAP Power System software with manual calculations. The result obtained from the power current simulation before the installation of DG voltage was the drop at the end of the channel at 2.515%. Meanwhile, the three-phase short-circuit current fault before the DG installation at the beginning of the channel was 13.43 kA. After the installation of DG with injection of 50%, DG power obtained voltage drop at the end of the channel was 1.715% and the current fault at the beginning network was 14.05 kA. In addition, with injection of 90%, DG power obtained voltage drop at the end of the channel was 1.06% and the current fault at the beginning network was 14.13%.
机译:本研究是PT的案例研究。 PLN(Ltd。)APJ Bandung区域采用拍摄的主题是在20 kV分配通道上安装分布式发电(DG)。本研究的目的是找出DG与电压分布系统中的电压曲线和三相短路故障的变化的影响,其中负载条件被认为是平衡的。本研究的原因是要知道DG可以改善通道的电压分布以及DG的电压曲线如何增加每总线上的三相短路故障。本研究中使用的方法是使用具有手动计算的ETAP电力系统软件进行比较电流和短路故障的仿真结果。在安装DG电压之前从电源电流模拟获得的结果是频道末端的下降在2.515%。同时,在通道开头的DG安装之前的三相短路电流故障为13.43 ka。在注射50%的DG安装后,DG功率在通道结束时获得的电压降为1.715%,开始网络的电流故障为14.05 ka。此外,通过注入90%,DG功率在通道末端获得的电压降为1.06%,开始网络的当前故障为14.13%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号