首页> 外文会议>Annual international coal preparation exhbition conference >WHEN DOES A BIGGER PROCESSING PLANT COST LESS THAN A SMALLER PLANT?
【24h】

WHEN DOES A BIGGER PROCESSING PLANT COST LESS THAN A SMALLER PLANT?

机译:什么时候更大的加工厂的成本低于较小的植物?

获取原文

摘要

Many coal operators have assumed that the most efficient use of capital is to build a coal processing plant sized such that it must be operated around the clock to fully utilize the capital assets. However, there may be times when that approach is more costly than building a bigger plant and operating fewer hours. When one considers the additional cost of extra crews, mobile equipment hours and other expenses required to operate a plant 24 hours a day, could it be lower in overall cost to build a bigger plant and reduce operating costs? Various scenarios are considered and evaluated to determine the lower overall cost of bigger versus small processing plant.
机译:许多煤炭运营商已经假设资本最有效地使用的是建造煤炭加工厂,使其必须在时钟围绕时钟运行,以充分利用资本资产。然而,可能有时这种方法比建立更大的植物和更少的时间更昂贵。当人们考虑额外的额外工作人员的费用时,每天24小时操作植物所需的移动设备时效和其他费用,可以降低整体成本,以建立更大的植物并降低运营成本?考虑和评估各种情景,以确定更大与小加工厂的总成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号