首页> 外文会议>World Congress on Intelligent Transport Systems and ITS America Annual Meeting >TRANSIT AGENCY LIGHT RAIL INCIDENT RESPONSE BEFORE AND AFTER ICM DEPLOYMENT: STRATEGIES AND CONSTRAINTS
【24h】

TRANSIT AGENCY LIGHT RAIL INCIDENT RESPONSE BEFORE AND AFTER ICM DEPLOYMENT: STRATEGIES AND CONSTRAINTS

机译:ICM部署之前和之后的过境机构轻轨事件响应:策略和制约因素

获取原文

摘要

As part of the U.S. Department of Transportation's ICM Initiative, Dallas Area Rapid Transit (DART) purchased new automatic passenger counter (APC) technology for their light rail system to provide passenger counts in real-time to their train control center and to provide data to the Integrated Corridor Management (ICM) decision support system. By gaining access to real-time passenger counts and location, DART hopes to respond more effectively to unplanned incidents on the rail network by enabling more responsive service adjustments such as bus bridging and additional consist deployment. This technology also allows DART to respond to mode shift recommendations that are part of the larger ICM project along the US-75 corridor. This paper summarizes how DART responded to rail incidents before the introduction of ICM, addresses what has changed after ICM deployment, and identifies constraints to optimum responses.
机译:作为美国运输部ICM倡议的一部分,达拉斯地区的快速运输(Dart)为其轻轨系统购买了新的自动乘客计数器(APC)技术,以实时向其列车控制中心提供乘客计数并提供数据集成走廊管理(ICM)决策支持系统。通过获取实时乘客计数和位置的访问,DART希望通过诸如总线桥接等总线桥接等更响应的服务调整来更有效地对导轨网络上的计划内发生的事件更有效地响应。该技术还允许DART响应沿US-75走廊的较大ICM项目的模式换档建议。本文总结了DART在引入ICM之前对铁路事件进行了回应,解决了ICM部署后发生了变化的内容,并确定了最佳响应的约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号