Commissioning and Start-up of QAFCO 5 and 6

机译:QAFCO 5和6的调试和启动

获取原文

摘要

The Process Plants of Qatar Fertilizer Company (QAFCO) are located at 2 sites in Mesaieed Industrial City. The new site for QAFCO 5 and 6 is located at about 3 km west of the old site of QAFCO 1 to 4 Plants. Q5 and Q6 Projects were the biggest expansion activity ever undertaken by QAFCO, increasing the ammonia and urea capacities by 1.6 and 2.8 million Metric Tons (MT) per year, respectively. The Engineering, Procurement, Construction and Commissioning (EPCC) contract for this project was signed with a consortium comprising of Saipem of Italy and Hyundai of South Korea in 2 stages. The Q5 contract was signed on the 2nd of December 2007. Q6 Contract was signed as an amendment to Q5 Contract on 9th of October 2009. This paper describes QAFCO's experience in the commissioning and start-up of the process facilities, the problems encountered and key lessons learnt during the commissioning.
机译:卡塔尔肥料公司(QAFCO)的过程植物位于梅西地工业城市的2个地点。 QAFCO 5和6的新网站位于QAFCO 1至4厂旧网站以西约3公里。 Q5和Q6项目是QAFCO的最大扩展活动,分别将氨和尿素容量增加1.6和每年280万吨(MT)。 该项目的工程,采购,建设和调试(EPCC)合同与联盟签署了包括意大利意大利的Saipem和2个阶段的Saipem。 Q5合同于2007年12月2日签署。Q6合同签署于2009年10月9日的Q5合同修正案。本文介绍了Qafco在流程设施的调试和启动方面的经验,遇到的问题和关键 在调试期间汲取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号