首页> 外文会议>IABSE Symposium on Engineering for Progress, Nature and People >Puente Nigale - Seismic Design of the Cable-stayed Main Bridges
【24h】

Puente Nigale - Seismic Design of the Cable-stayed Main Bridges

机译:Puente Nigale - 缆绳留桥的地震设计

获取原文

摘要

Lago de Maracaibo (Puente Nigale) fixed-link project. The link is 12 km long from shore to shore, and consists of east and west approach bridges and a main cable-stayed bridge over the navigation channel. The link accommodates two parallel bridge structures, one for road traffic and one for rail service. The main bridges consists of two parallel cable stayed bridges with main spans of 430 m and is situated in a seismically active area characterized by a peak ground acceleration of about 0.27g for a 1000 year return period event. The paper discusses the seismicity in the project area, the development of the seismic design loads, the seismic design criteria, the seismic design strategy and the seismic design of the structure. In particular, the deep pile foundations on soft soil presented unique challenges to the seismic design.
机译:Lago de Maracaibo(Puente Nigale)固定链接项目。这些连杆距离岸到岸边12公里,由东方和西方接近桥梁和导航通道的主要缆绳座桥梁组成。该连杆可容纳两个平行桥梁结构,一个用于道路交通,一个用于铁路服务。主桥梁由两个平行的电缆停留桥组成,主跨度为430米,位于地震活动区域,其特征在于峰接地加速度为1000年的返回期事件约0.27g。本文讨论了项目区的地震性,地震设计负荷的发展,地震设计标准,地震设计策略和结构的地震设计。特别是,软土的深桩基础对地震设计呈现出独特的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号