首页> 外文会议>International Congress on Advances in Nuclear Power Plants >Development of Risk-Informed In-service Inspection Program for Ulchin Nuclear Power Plant Unit 4
【24h】

Development of Risk-Informed In-service Inspection Program for Ulchin Nuclear Power Plant Unit 4

机译:开发ULCHIN核电站4号核电站风险信息检测计划4

获取原文

摘要

At present, piping in all nuclear power plants is being subject to inservice inspection (ISI) based on certaindeterministic criteria set by Section XI of the ASME Boiler and Pressure Vessel Code and Final Safety Analysis Report (FSAR). Risk informed Inservice Inspection (RI-ISI) methodology for piping has been developed as an alternative to examination location selection requirement of ASME Section XI. Ulchin nuclear power plant Unit 4 was a pilot plant for application of this methodology in Korea. Ulchin Unit 4 was a partial scope (ASME Class 1, 2) program; therefore, class 1,2 piping systems of Ulchin Unit 4 which are modelled in the plant PSA model have been evaluated using the WOG risk-informed ISI process. The overall results from Ulchin Unit 4 RI-ISI program are discussed in this paper.
机译:目前,所有核电站的管道都是基于由ASME锅炉和压力容器码和最终安全分析报告(FSAR)的XI部分XI所设定的鉴定确定标准的鉴定检查(ISI)。风险被告知Inservice检验(RI-ISI)管道方法的方法是作为ASME第Xi的检查位置选择要求的替代方案。 Ulchin核电站4是用于在韩国应用这种方法的试验工厂。 Ulchin单元4是部分范围(ASME类1,2)计划;因此,已经使用WOG风险通知的ISI进程评估了在工厂PSA模型中建模的ULCHIN单元4的1,2个管道系统。本文讨论了Ulchin单元4 RI-ISI计划的总体结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号