首页> 外文会议>DAAAM International Symposium on Intelligent Manufacturing and Automation >Resource Constrained Multi-Project Scheduling with Priority Rules Analytic Hierarchy Process
【24h】

Resource Constrained Multi-Project Scheduling with Priority Rules Analytic Hierarchy Process

机译:资源受限于优先级规则和分析层次结构的多项目调度

获取原文
获取外文期刊封面目录资料

摘要

This paper presents a hybrid algorithm that integrates the project priority (or criticality) with project schedule development for multi-project scheduling problem under resource constrained-situation. The objective here is to minimize the project make-span as well as the penalty cost when some projects carry higher priority. Since the problem is NP hard, we solve this problem by integrating the project priority with the activity priority. The project schedule is generated using a hybrid algorithm based on priority rules and AHP. The proposed algorithm is demonstrated to be better than existing priority rules. The effectiveness of the proposed algorithm is validated with computational results.
机译:本文介绍了一种混合算法,将项目优先级(或关键性)与资源受限情况下的多项目调度问题进行了项目时间表开发。这里的目标是最小化项目制作跨度以及当一些项目承载更高的优先级时的罚款。由于问题是NP硬,因此通过将项目优先级与活动优先级集成来解决此问题。使用基于优先级规则和AHP的混合算法生成项目计划。所提出的算法被证明是比现有的优先级规则更好。所提出的算法的有效性验证了计算结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号