Bolting Procedures in Outokumpu's Kemi Mine

机译:奥托昆普凯米矿的螺栓手术

获取原文

摘要

The working environment for ground support installation in mines has improved a lot during the last 20-30 years, with more and more mechanized installations of the different ground support elements such as bolts, cable bolts and screen. However ground support installation productivity has not followed the same development curve. In fact, its productivity has more or less remained constant and in some cases has even fallen if, as an example, comparisons are made between the manual and mechanized installations of bolts. One reason for this is that modern mechanised bolt rigs are very complex, capable to perform many tasks. To be able to fully utilize this equipment's capability a different level of maintenance and product support is required. This paper describes the bolting process in Outokumpu's Kemi mine that has a very interesting procedure for bolt installation and has also paid an unsurpassed attention to the maintenance procedures to improve productivity.
机译:在过去的20 - 30年期间,矿山地区支撑安装的工作环境在较近的20 - 30年内提高了很多,采用螺栓,电缆螺栓和屏幕等不同地支撑元件的越来越多的机械化安装。然而,地面支持安装生产率没有遵循相同的开发曲线。事实上,它的生产率或多或少仍然存在持续,并且在某些情况下甚至在螺栓手动和机械化安装之间进行比较,甚至是跌倒。这是一个原因是现代机械化螺栓钻机非常复杂,能够执行许多任务。为了能够充分利用该设备的能力,需要不同级别的维护和产品支持。本文介绍了Outokumpu的Kemi Mine中的螺栓处理,具有非常有趣的螺栓安装程序,并且还对维护程序进行了无与伦比的关注,以提高生产力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号