首页> 外文会议>Australasian Tunnelling Conference >Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas - Alaskan Way Bored Tunnel, Seattle, Washington
【24h】

Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas - Alaskan Way Bored Tunnel, Seattle, Washington

机译:在城市地区监测隧道项目的当前和最佳做法 - 阿拉斯加风钻孔隧道,西雅图,华盛顿

获取原文

摘要

Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world's largest soft-ground bored tunnel in Seattle, Washington. The paper describes and provides a return of experience on current and best practice for monitoring tunnelling projects in urban areas. The owner's contractual approach is discussed to highlight the flexibility of the design-built contract in achieving equal or better solutions by allowing for the use of innovative technics. Special attention is given to the management and involvement of third parties (building owners, utility owners), including the public, to overcome all challenges faced during the installation of the monitoring system in downtown Seattle for over 1000 instruments. Finally, the authors present the strategies implemented for managing the monitoring data and communicating with the owner, contractor and stakeholders.
机译:建立强大的岩土工程和施工监测计划是在华盛顿西雅图的世界上最大的软土地钻孔隧道成功交付的钥匙之一。 本文介绍并提供了对城市地区监控隧道项目的最新和最佳实践的回报。 讨论了所有者的合同方法,以突出设计制造的合同在实现平等或更好的解决方案方面通过允许使用创新技术来实现灵活性。 特别注意第三方(建筑物所有者,公用事业所有者),包括公众,克服在安装在西雅图市中心的监测系统期间面临的所有挑战,以获得超过1000种乐器。 最后,作者介绍了管理监测数据并与所有者,承包商和利益相关者进行沟通的战略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号