Tunnel Design in an Alliance for Waterview Connection, New Zealand

机译:隧道设计在新西兰水景连接联盟中

获取原文

摘要

The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland's Western Ring Route connecting State Highways 20 and 16. The project includes twin three-lane motorway tunnels 2.4 km long and 13.1 m internal diameter (ID). The tunnel construction started in November 2013 using the tenth largest earth pressure balance (EPB) tunnel boring machine (TBM) in the world. The tunnels will pass beneath urban and greenfield areas as well as a major local arterial road. The project is being delivered by an alliance of constructors, designers and the New Zealand Transport Agency. This paper describes some of the key innovative and cost saving design solutions that have been achieved through collaboration in the alliance environment with the construction team, owner's verifier, the segmental lining precast suballiance and the M&E suballiance for the underground works. The key design elements of the tunnel comprise a three-lane roadway, invert culvert and backfill, precast segmental lining, sixteen mined cross passages including a low point sump cross passage and steel segments for opening to the cross passages. This paper reviews interdisciplinary design integration and the economies achieved in the permanent works tunnel lining design, including reduction in lining thickness and optimising reinforcement, cross passage separation of 150 m, efficient design of the invert culvert and backfill design, main drainage pipe and low point sump. The paper also describes the attributes of the TBM and the invert culvert construction methodology.
机译:Waterview Connection将为州立公路提供高质量的战略替代品,并完成奥克兰的西环路线连接状态高速公路20和16.该项目包括双车道高速公路隧道2.4公里,内径13.1米内径(ID)。隧道施工于2013年11月,在世界上使用第十大的地球压力平衡(EPB)隧道镗床(TBM)。隧道将通过城市和格林菲尔德地区,以及一条主要的地方动脉道。该项目由建设者,设计师和新西兰运输机构的联盟提供。本文介绍了一些关键的创新和成本节约设计解决方案,通过联盟环境与建筑队伍,所有者的验证者,节级衬里预制郊区和地下工程的M&e Subiance进行了一系列关键的创新和成本节约设计解决方案。隧道的关键设计元件包括三通道的巷道,倒置涵洞和回填,预制节段衬里,十六次开采的交叉通道,包括低点底盘交叉通道和用于开放到交叉通道的钢段。本文评论跨学科设计集成和在永久工程隧道衬里设计中实现的经济,包括减少衬里厚度和优化加固,交叉通道分离150米,逆变涵洞和回填设计的高效设计,主要排水管和低点陷。本文还描述了TBM的属性和逆变涵洞施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号