【24h】

Study on risk management in CBM project

机译:CBM项目风险管理研究

获取原文

摘要

The frame of risk management system was established and risk analysis was addressed. First, the inherent risk factors in the CBM project were identified based on work breakdown structure method of project management. Then, the technical risks in implementing the CBM project were assessed with the fuzzy synthetic evaluation method and the assessment results were discussed. Finally, risk response measures for risk response were suggested.
机译:建立了风险管理系统框架,并解决了风险分析。首先,基于项目管理的工作分解结构来确定CBM项目的固有风险因素。然后,通过模糊综合评价方法评估实施CBM项目的技术风险,并讨论了评估结果。最后,提出了风险反应的风险反应措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号