首页> 外文会议>International symposium on design and practice of geosynthetic-reinforced soil structures >An Application of the Connecting System between MSE Wall and Soil Nail
【24h】

An Application of the Connecting System between MSE Wall and Soil Nail

机译:MSE墙与土着钉子连接系统的应用

获取原文

摘要

Mechanically Stabilized Earth (MSE) wall is mainly applied for fill construction, while the soil nail is mainly used in cut slope where ground space is limited. Combining MSE wall and soil nail could be a good solution for MSE wall with inadequate length and when the safety of external stability is questionable. The soil-nail/MSE wall integral system not only overcomes the space limitation problem, but also reduces the risk during excavation of existing ground for constructing MSE wall. In order to enhance the stability of the soil-nail/MSE wall integral system, the first author has developed a specific connection system (i.e. vertical bars connecting soil nails, steel wire connection between the bars and the geogrids). This paper describes a case study on soil-nail/MSE wall integral system that uses the connecting system in Taiwan. The wall is located at Chi-Nan University, Taiwan, for repairing a slope failure that occurred during the Chi-Chi earthquake in 1999. Up to 2012, this soil-nail/MSE wall integral system has been proved to be stable after suffering from many earthquakes and heavy storms.
机译:机械稳定的地球(MSE)墙主要用于填充结构,而土着钉子主要用于切割坡度,地面空间受到限制。组合MSE墙和土着钉子可能是MSE墙体的良好解决方案,其长度不足,当外部稳定性的安全性是可疑的。土钉/ MSE墙体积分系统不仅克服了空间限制问题,而且还降低了挖掘现有地面墙壁的风险。为了提高土着/ MSE墙体积分系统的稳定性,第一作者开发了一种特定的连接系统(即连接土钉,钢丝和地质格栅之间的垂直条。本文介绍了使用台湾连接系统的土着/ MSE墙体积分系统的案例研究。该墙位于台湾志南大学,为修复了1999年志志地震期间发生的坡度故障。至2012年,这一土地钉/卫生间墙体积分系统已被证明在遭受后稳定许多地震和大暴风雨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号