An Application of the Connecting System between MSE Wall and Soil Nail

机译:MSE墙与土钉连接系统的应用

获取原文
获取原文并翻译 | 示例

摘要

Mechanically Stabilized Earth (MSE) wall is mainly applied for fill construction, while the soil nail is mainly used in cut slope where ground space is limited. Combining MSE wall and soil nail could be a good solution for MSE wall with inadequate length and when the safety of external stability is questionable. The soil-nail/MSE wall integral system not only overcomes the space limitation problem, but also reduces the risk during excavation of existing ground for constructing MSE wall. In order to enhance the stability of the soil-nail/MSE wall integral system, the first author has developed a specific connection system (i.e. vertical bars connecting soil nails, steel wire connection between the bars and the geogrids). This paper describes a case study on soil-nail/MSE wall integral system that uses the connecting system in Taiwan. The wall is located at Chi-Nan University, Taiwan, for repairing a slope failure that occurred during the Chi-Chi earthquake in 1999. Up to 2012, this soil-nail/MSE wall integral system has been proved to be stable after suffering from many earthquakes and heavy storms.
机译:机械稳定土(MSE)墙主要用于填充施工,而土钉主要用于地面空间有限的挖坡。当长度不适当,且外部稳定性的安全性值得怀疑时,将MSE墙和土钉结合起来可能是一种不错的解决方案。土钉/ MSE墙整体系统不仅克服了空间有限的问题,而且降低了在开挖现有地面上建造MSE墙的风险。为了增强土钉/ MSE墙整体系统的稳定性,第一作者开发了一种特定的连接系统(即,连接土钉的垂直钢筋,钢筋与土工格栅之间的钢丝连接)。本文介绍了一个使用台湾连接系统的土钉/ MSE墙整体系统的案例研究。该墙位于台湾Chi-Nan大学,用于修复1999年在Chi-Chi地震中发生的边坡破坏。直到2012年,这种土钉/ MSE墙整体系统在遭受了地震之后被证明是稳定的。许多地震和暴风雨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号