首页> 外文会议>International Conference on Advances in Civil Infrastructure Engineering >Foundation Pit Dewatering and Ground Subsidence in Binary Structural Stratum of Wuhan
【24h】

Foundation Pit Dewatering and Ground Subsidence in Binary Structural Stratum of Wuhan

机译:武汉二元结构层面的基坑脱水与地下沉降

获取原文

摘要

The geological model of pit of binary structure stratum is established under the analysis of the engineering geological characteristics of the binary structure stratum of Wuhan, combined with land subsidence and groundwater flow characteristics calculated. Associated with the use of software of Processing Modflow to calculate settlement around the excavation, the rules of ground settlement of excavation of dual structure stratum in Wuhan are obtained. And it provides a theoretical foundation and practical support for the same project.
机译:二元结构坑坑地质模型在武汉二元结构层的工程地质特征分析下建立,结合了土地沉降和地下水流动特性。与使用软件处理Modflow的软件相关联,以计算挖掘的沉降,获得了武汉双结构层的挖掘地面结算规则。它为同一项目提供了理论基础和实际支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号