首页> 外文会议>International Conference on Advances in Civil Infrastructure Engineering >Risk Analysis of High-rise Reinforced Concrete Frame-shear Wall Structure in Progressive Collapse
【24h】

Risk Analysis of High-rise Reinforced Concrete Frame-shear Wall Structure in Progressive Collapse

机译:高层钢筋混凝土框架墙体结构在逐步崩溃中的风险分析

获取原文

摘要

The purpose of the this study was to find the influence of local members of high-rise reinforced concrete frame-shear wall structure failed in different position. Referred to the basic requirements against progressive collapse provided by JGJ03-2010, Based on alternate path method. This paper presents an analysis procedure that made Linear static analysis to a modal of 24-storey frame-shear wall structure designed according to the current code with SAP2000. The results show that once the edge column failed, the structure will collapse. However, the corner shear wall constitute little threat to the progressive collapse. After the local members failed, the lower part of the building contribute to the load path and it can results in axial force ruleless in beams, which make against to load bearing if they are tensile forces. The concentrated tensile stress appears around the continuous beam, and it is possible to be broken early after local member failed if close to the failed shear wall.
机译:本研究的目的是找到高层钢筋混凝土框架墙结构的局部成员在不同位置失败的影响。基于备用路径方法,提到了JGJ03-2010提供的逐步崩溃的基本要求。本文介绍了一种分析程序,使线性静态分析对具有SAP2000的当前码设计的24层框架剪力墙结构的模态。结果表明,一旦边缘列失败,结构将崩溃。然而,转角剪切墙对逐渐崩溃构成很少的威胁。在本地成员失败之后,建筑物的下部有助于负载路径,可以导致轴向力在光束中造成轴向,如果它们是拉伸力,则可以防止承载承载。浓缩的拉伸应力出现在连续梁周围,如果靠近失败的剪力墙,则可能会在局部成员失效时破裂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号