首页> 外文会议>Water Environment Federation annual technical exhibition and conference >SUPERFUND SITE REMEDY RETURNS RECREATIONAL PARK TO COMMUNITY
【24h】

SUPERFUND SITE REMEDY RETURNS RECREATIONAL PARK TO COMMUNITY

机译:Superfund网站补救措施将娱乐公园返回社区

获取原文

摘要

Since 1999, the residents of Harrison Township, Pennsylvania have been enjoying their new Community Park and adjacent greenspace which was once a waste disposal site known principally for its presence on the Superfund National Priorities List (NPL). Between the mid 1800’s and the mid 1900’s approximately 1.2 million cubic yards of wastes from the production of inorganic and organic chemicals and steel, and mining debris, were placed beneath the surface of this site, which is located in Allegheny County in the Pittsburgh metropolitan area. When the site was promulgated onto the NPL, concerns included surface exposure of waste materials, leachate discharges, and stormwater runoff. As one of the predominant potentially responsible parties (PRPs), ATOFINA Chemicals, Inc., partnered with the Township, the Pennsylvania Department of Environmental Protection, and EPA Region III to seek a secure outcome for this real estate. ATOFINA constructed an interim collection and treatment system for the leachate discharges to the Allegheny River. This was followed by a Remedial Investigation to characterize the site and potential risks, a Feasibility Study to evaluate options for remediating the potential risks, and a Remedial Design/Remedial Action to construct the selected remedy. ATOFINA committed to construct, operate, and maintain the remedy so that the properties could be redeveloped as a community park and greenspace. An 18-acre geocomposite, low permeability capping system was constructed atop the graded waste. Leachate and affected shallow groundwater were contained by an improved collection system and a new permanent treatment system. The park facilities were constructed on the upper portion of the site, which include 2 baseball fields, 2 tennis courts, and a picnic area. Landscaping employs shallow rooted shrubs and trees and a hardy grass ground cover. The adjacent greenspace is grassed. Challenges presented during the project and their resolutions are also discussed herein.
机译:自1999年以来,宾夕法尼亚州哈里森乡的居民一直在享受他们的新社区公园和邻近的绿地空间,曾经是一个垃圾处理网站,主要是在超级优惠国家优先级名单(NPL)上的存在。 1800年代中期与1900年中期,从生产无机和有机化学品和钢铁和采矿碎片生产的大约120万立方码余量,占据了本网站的表面,位于匹兹堡大都市区的阿勒格尼县。当网站颁布到NPL上时,涉及废料表面暴露,渗滤液排放和雨水径流。作为主要潜在的责任缔约方(PRPS),Atofina Chemicals,Inc。与乡镇,宾夕法尼亚州环保部门和环保署区域III合作,为这座房地产寻求安全的成果。 Atofina为渗滤液排放到Allgheny河的临时收集和治疗系统。其次是对特性调查进行了补救调查,以表征现场和潜在风险,可行性研究,以评估补救潜在风险的选择,以及构建所选补救措施的补救设计/补救措施。 Atofina致力于构建,运营和维护补救措施,以便该物业可以作为社区公园和绿地空间重新开发。 18英亩的Geocomposite,低渗透覆盖系统以分级废物构建。改进的收集系统和新的永久性治疗系统含有渗滤液和受影响的浅地下水。公园设施是在本地的上部构建,包括2个棒球场,2个网球场和野餐区。景观铺设浅根灌木和树木和耐寒的草地覆盖物。邻近的绿色空间是草的。本文还讨论了项目期间提出的挑战及其决议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号