OPTIMIZING THE CONNECTION OF A NEW 340 MGD HEADWORKS FACILITY TO LIVE INCOMING SEWER TRUNKLINES AND THE PRIMARY TREATMENT PROCESS

机译:优化新的340 MGD HeadWorks设施的连接到Live Incoming Sewer Trunklines和主要处理过程

获取原文

摘要

The paper describes the approach which was taken by Orange County Sanitation District (OCSD) to tie-in a new 340 MGD headworks facility with multiple structures to existing incoming trunkline sewers ranging from 78-inches to 108-inches in size and also tying it to existing primary treatment processes, without compromising the plant operation and treatment. The paper describes the 20 step tie-in approach that was established to sequence the construction work which reduced the spill risks during these tie-ins and helped plan the shutdowns not only at the affected OCSD Plant No. 2 but also helped with coordination of flows with the sister OCSD Plant No. 1. The paper also describes the flow scenarios adopted to reduce spill risks and the techniques used to make the connections without stopping the flows.
机译:本文介绍了橙县卫生区(OCSD)将新的340 MGD营造工具捆绑在一起,以多种结构为现有的传入的干线下水道,范围为78英寸至108英寸,也将其与其联系起来现有的主要治疗方法,不影响植物操作和治疗。本文介绍了建立的20步系数,该方法是序列序列的建设工作,这些工作减少了这些系列期间的溢出风险,并帮助计划不仅在受影响的OCSD工厂2号,而且还有助于流动的协调与姐妹OCSD植物编号1.本文还介绍了减少溢出风险的流程,以及用于在不停止流动的情况下进行连接的技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号