Ground Conditions Encountered and the Support System Installed in the Realigned Starter Tunnel for the Lake Mead No.3 Intake, Nevada

机译:遇到的地面条件和安装在Realigned Starter隧道中的支持系统,用于米德,Nead No.3 Intake,Nevada

获取原文

摘要

In 2008 the Southern Nevada Water Authority (SNWA) awarded Contract No. 070F 01 C1 for Lake Mead Intake No. 3-Shafts and Tunnel to a joint venture between Impregilo SpA and SA Healy, the Vegas Tunnel Constructors. Following award, the 9m diameter, 185m deep access shaft and 20m wide, 10m high and 50m long TBM launch chamber were successfully constructed. Difficult conditions encountered in the original starter tunnel during 2010 resulted in its abandonment and sealing in early 2011. Vegas Tunnel Constructors commenced excavation of a realigned starter tunnel thereafter to allow the installation and erection of the 7.22m diameter 190m long Herrenknecht AG Dual Mode Mixed Shield TBM. This paper describes the ground conditions encountered during the excavation of the realigned starter tunnel, discusses the excavation production data and summarizes the support system employed to successfully complete the starter tunnel.
机译:2008年,内华达州南部的水务局(SNWA)授予Lake Mead Intake No. 3-Shauls Intake No. 3-Shauls Antake No. 3-Shaft的合同070F 01 C1,以在Empregogo Spa和Sa Heally,Vegas隧道构造函数之间的合资企业。奖项之后,9米直径,185米深度接入轴和20米宽,10米高,50米长的TBM发射室被成功地构建。 2010年初原籍隧道中遇到的困难条件导致其放弃和密封在2011年初。拉斯维加斯隧道构造函数开始挖掘重新启动隧道,此后允许安装和安装7.22米直径190米长的海伦克考克代AG双模混合屏蔽TBM。本文介绍了在挖掘出启动隧道的挖掘过程中遇到的地面条件,讨论了挖掘生产数据,总结了所用化的支持系统成功完成启动隧道。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号