首页> 外文会议>World renewable energy forum >THE IMPACT OF SOLAR UNCERTAINTY ON PROJECT FINANCEABILITY: MITIGATING ENERGY RISK THROUGH ON-SITE MONITORING
【24h】

THE IMPACT OF SOLAR UNCERTAINTY ON PROJECT FINANCEABILITY: MITIGATING ENERGY RISK THROUGH ON-SITE MONITORING

机译:太阳能不确定性对项目融资性的影响:通过现场监测缓解能量风险

获取原文

摘要

As projects increase in size and installed cost, a greater emphasis is being placed on reducing the uncertainty assigned when evaluating a project's long-term performance. For 11 locations, at least one year of high-quality ground measurements were used to estimate the long-term solar resource and associated uncertainty. In parallel, the long-term solar resource and uncertainty were estimated using available modeled data. These results were quantified and evaluated to determine how the availability of on-site data affects the uncertainty in the long-term solar resource. Results from this study indicate a difference in estimated solar resource of up to 6% when using on-site measurements compared to satellite-modeled data, and corresponding to a general reduction in uncertainty of approximately 2% to 6%.
机译:随着项目规模和安装成本的增加,更加重视减少评估项目的长期绩效时分配的不确定性。对于11个地点,至少一年的高质量地面测量用于估计长期太阳能资源和相关的不确定性。并行地,使用可用的建模数据估计长期的太阳能资源和不确定性。这些结果被定量和评估,以确定现场数据的可用性如何影响长期太阳能资源中的不确定性。该研究的结果表明,与卫星建模的数据相比,使用现场测量时,估计的太阳能资源差异高达6%,并且对应于大约2%至6%的不确定性的一般降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号