THE IMPACT OF SOLAR UNCERTAINTY ON PROJECT FINANCEABILITY: MITIGATING ENERGY RISK THROUGH ON-SITE MONITORING

机译:太阳能不确定性对项目融资能力的影响:通过现场监测缓解能源风险

获取原文

摘要

As projects increase in size and installed cost, a greater emphasis is being placed on reducing the uncertainty assigned when evaluating a project's long-term performance. For 11 locations, at least one year of high-quality ground measurements were used to estimate the long-term solar resource and associated uncertainty. In parallel, the long-term solar resource and uncertainty were estimated using available modeled data. These results were quantified and evaluated to determine how the availability of on-site data affects the uncertainty in the long-term solar resource. Results from this study indicate a difference in estimated solar resource of up to 6% when using on-site measurements compared to satellite-modeled data, and corresponding to a general reduction in uncertainty of approximately 2% to 6%.
机译:随着项目规模的增加和安装成本的增加,在评估项目的长期绩效时,将更多的重点放在减少分配的不确定性上。对于11个地点,至少使用一年的高质量地面测量来估算长期太阳能资源和相关的不确定性。同时,使用可获得的模型数据估算了长期太阳能资源和不确定性。对这些结果进行量化和评估,以确定现场数据的可用性如何影响长期太阳能资源的不确定性。这项研究的结果表明,与卫星模型数据相比,使用现场测量时估计的太阳能资源差异最多可达6%,相应地,不确定性通常会降低约2%至6%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号