首页> 外文会议>Indonesian Petroleum Association Annual Convention >SUCCESSFUL CBM CORING ACTIVITY INTEGRATED WITH CONVENTIONAL WELL DRILLING IN SANGA SANGA BLOCK, MAHAKAM DELTA, EAST KALIMANTAN, INDONESIA
【24h】

SUCCESSFUL CBM CORING ACTIVITY INTEGRATED WITH CONVENTIONAL WELL DRILLING IN SANGA SANGA BLOCK, MAHAKAM DELTA, EAST KALIMANTAN, INDONESIA

机译:成功的CBM取芯活动与萨兰加萨兰卡街区,Mahakam Delta,East Kalimantan,印度尼西亚的常规钻井相结合

获取原文

摘要

The Sanga Sanga Production Sharing Contract (PSC) which is known as a very large conventional gas producer in East Kalimantan, is now developing another opportunity; coal bed methane (CBM). In November 2009, the Sanga Sanga PSC contractors secured the CBM rights in the PSC. Having both the conventional and CBM rights allowed the Sanga Sanga operator (VICO) to explore opportunities to combine the CBM initial appraisal program with the conventional development well drilling, by having CBM coring in oil and gas development wells in areas where there may be CBM potential. Coring of the coal is normally the first step in determining whether a CBM project can be successful. Analysis of the cores allows calculation of gas content, gas composition, gas saturation, and also coal properties. The Sanga Sanga CBM coring campaign started in early 2010 and so far 18 wells have been cored which 10 of those was cores obtained in the conventional well drilling. To comply with the conventional well drilling objectives and also to get good data, a CBM Coring Operation Decision Tree was created. CBM coring requires the use of wireline system to minimize the retrieval time of the cores. A quick and accurate core retrieving and handling processes is essential to minimize the lost gas measurement of the total gas content (lost gas, measured gas, residual gas). CBM wireline coring operations in Sanga Sanga project brought up some issues to be resolved. However overall there was a very good result with a very high core recovery in average of 85% with a total of 434 feet of coal recovered. The key point of this article is that it is possible to accelerate a CBM project evaluation in a double PSC area such as Sanga Sanga area with good efficiency.
机译:Sanga Sanga生产分享合同(PSC)被称为令人称为Kalimantan的非常大的常规天然气生产商,现在正在开发另一个机会;煤层甲烷(CBM)。 2009年11月,Sanga Sanga PSC承包商在PSC中获得了CBM权利。拥有传统和CBM权利均允许Sanga Sanga运营商(Vico)探讨将CBM初始评估计划与传统发展良好钻井相结合的机会,通过在可能存在CBM潜力的区域中具有石油和天然气发育井中的CBM芯片。煤炭的取芯通常是确定CBM项目是否可以成功的第一步。核心分析允许计算气体含量,气体组成,气体饱和度以及煤层。 Sanga Sanga CBM取代运动开始于2010年初,到目前为止,已经核查了10个井,其中10种常规钻井中获得的核心。为了符合传统的钻井目标并获得良好的数据,创建了一个CBM取芯操作决策树。 CBM Culing要求使用有线系统来最小化核心的检索时间。快速准确的核心检索和处理过程对于最小化总含气体含量的气体测量(丢失的气体,测量的气体,残留气体)是必要的。 Sanga Sanga项目中的CBM Wireline取芯操作带来了一些问题要解决。然而,总体而言,平均核心恢复非常高的核心恢复率,共恢复了434英尺的煤炭。本文的关键点是可以在诸如Sanga Sanga区域的双重PSC区域中加速CBM项目评估,效率良好。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号