首页> 外文会议>Indonesian Petroleum Association Annual Convention >WELL HEAD COMPRESSOR: WELL SELECTION, PERFORMANCE, AND OPTIMIZATION BY PRACTICAL OPERATION
【24h】

WELL HEAD COMPRESSOR: WELL SELECTION, PERFORMANCE, AND OPTIMIZATION BY PRACTICAL OPERATION

机译:井头压缩机:通过实际操作选择,性能和优化

获取原文

摘要

VICO Indonesia has been operated in Sanga-Sanga PSC since 1968. Currently most of VICO fields are categorized as mature fields. In compliance with BP Migas goals to support national energy security, VICO Indonesia has implemented renewal plans since 2007 to maintain gas production from each well. One sucessfull renewal plan has been the utilization of Well Head Compressor (WHC) to lower the abandonment pressure and increase gas recovery. In utilization of WHC, one of the important factors is how to determine WHC wells candidates. Based on reservoir characteristics, production history, and latest pressure data, critical wells are short-listed for flow testing to the pit (based on Coleman and turner rate). Well candidates for WHC can be chosen based on well performance during this test. Mobile WHC will be applied to the best performing well as field trial. Finally, permanent WHC is installed to replace mobile WHC. Producing well B-107L was one of the successful results of using WHC. Gas production increased 594 mscf and well life was extended with three years compare to its natural flow.
机译:自1968年以来,Vico Indonesia已在Sanga-Sanga PSC中运营。目前大多数Vico字段被分类为成熟的领域。根据BP MIGAS支持国家能源安全,Vico Indonesia自2007年以来实施了更新计划,以维持各井的天然气生产。一个Sucessfull续订计划一直利用井头压缩机(WHC)以降低遗弃压力并增加气体回收率。在利用WHC时,一个重要因素之一是如何确定WHC井候选人。基于储层特性,生产历史和最新的压力数据,关键井是坑的流量测试的短信(基于科尔曼和特纳率)。 WHC的候选者可以根据在此测试期间的性能进行选择。移动性WHC将应用于作为现场试验的最佳表现良好。最后,安装永久性WHC以取代移动WHC。生产良好的B-107L是使用WHC的成功结果之一。天然气产量增加594 MSCF,井寿命与其自然流动相比三年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号