首页> 外文会议>Pan-Am CGS geotechnical conference >A Case History on the use of High Strength Woven Geotextiles to Reinforce a Oil Sands Tailings Pond Closure
【24h】

A Case History on the use of High Strength Woven Geotextiles to Reinforce a Oil Sands Tailings Pond Closure

机译:关于使用高强度编织土工织物的案例历史,加强了油砂尾矿池塘封闭

获取原文

摘要

The use of high strength woven geotextiles to provide reinforcement for sludge pond caps has been common practice for a number of years. To date the use of woven geotextiles to provide reinforcement for oil sands tailings pond closures has been limited. This paper presents a case history of the first large scale use of high strength woven geotextiles to cap an oil sands tailings pond filled with tailings. This high strength woven geotextile project is Canada's largest to date. The closure of an oil sands tailings pond differs from other pond capping operations due to the scale of the pond and the low bearing capacity of the soft tailings areas. The pond in this case history is approximately 2 by 3 kilometres in extent; much too large to cover with a single fabric panel. This pond closure required the creation of 13 kilometres of roads 100 m wide to create an access grid to enable covering of the remaining area. Building these roads required working in the winter in order to use the frozen surface of the pond for construction support. This paper covers the work and processes developed during construction of this grid of access roads in the winter of 2010.
机译:使用高强度织造土工织物来为污泥池帽提供加固,这一直是常见的惯例。迄今为止编织土工织物的使用,为油砂尾矿池塘盖板提供有限的矿床。本文提出了一个案例历史历史,高强度采用高强度编织土工织物来盖上油砂尾矿池塘装满尾矿。这项高强度编织土工织物项目是加拿大最大的约会。由于池塘的规模和软尾矿区域的低承载力,封闭油砂尾矿池的封闭池与其他池塘封盖操作不同。在这种情况下,池塘在范围内约为3公里;太大而无法覆盖单个织物面板。这种池塘关闭需要创建13公里的道路100 M宽,以创建访问网格,以实现剩余区域。建立在冬季工作的这些道路,以便使用池塘的冰冻表面进行建筑支持。本文涵盖了2010年冬季施工此网路网格的工作和过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号