【24h】

Improving Truck-Shovel Matching

机译:改善卡车 - 铲斗匹配

获取原文

摘要

Truck/shovel operations constitute 50 - 60 per cent of the cost of open pit mining operations. Mining companies, therefore, are constantly seeking to close the gap between actual truck/shovel productive capacity and maximum potential truck/shovel capacity. This paper analyses the performance of a mixed truck/shovel fl eet in an open cut coal mine in Australia. It analyses operating delays, and proposes a novel graphical means of determining trucklimited or shovel-limited operations. A goal seeking algorithm is advanced in order to maximise truck/shovel match factors (MF) and hence optimise fl eet productivity.
机译:卡车/铲业务占露天采矿业务成本的50-60%。因此,采矿公司不断寻求缩小实际卡车/铲生产能力和最大潜在卡车/铲子能力之间的差距。本文分析了澳大利亚开放式煤矿中混合卡车/铲子的性能。它分析了运行延迟,并提出了一种新颖的图形方法,用于确定卡车限制或铲斗的操作。目标寻求算法是先进的,以最大化卡车/铲斗匹配因子(MF),从而优化FL EET生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号