首页> 外文会议>International symposium on advancement of construction management and real estate >Analysis on the Differences of Tendering Behavior Between Public and Private Project in China Nanjing
【24h】

Analysis on the Differences of Tendering Behavior Between Public and Private Project in China Nanjing

机译:南京市公共项目招标行为差异分析

获取原文

摘要

Based on a survey on China's Nanjing construction market, it is found that there are some differences about the tenderee's behavior between public and private investment projects: " ' Public Invitation to Bid and Synthesis Bid Evaluation Method' are usually used in public projects, but ' Invitation to Bid by Request and lowest bid method' are usually used in private projects". Why are there differences between public and private investment project in bidding format > bid evaluation method and their combinations? The answers are not self-evident. Perhaps many factors will have an influence on the tenderee's behaviors, but the paper find that credit deficiency and property right distortion are the key factors which result in the difference between public and private investment project The influence mechanism is analyzed in the paper.
机译:基于中国南京建筑市场的调查,有人发现,关于公共和私人投资项目之间的招标行为存在一些差异:“”公众邀请投标和综合评估方法“通常用于公共项目,但”通过请求和最低出价方法的出价邀请通常用于私人项目“。为什么公共和私人投资项目之间的差异竞标格式>出价评估方法及其组合?答案并不是不言而喻的。也许很多因素会对招标的行为产生影响,但本文发现信用缺陷和财产权扭曲是导致公共和私人投资项目之间差异的关键因素,在论文中分析了影响机制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号