首页> 外文会议>International Waste Management and Landfill Symposium >DEVELOPING SOLUTIONS FOR NATIONAL END-OF-WASTE CRITERIA FOR AGGREGATES FROM INERT WASTE IN THE UK
【24h】

DEVELOPING SOLUTIONS FOR NATIONAL END-OF-WASTE CRITERIA FOR AGGREGATES FROM INERT WASTE IN THE UK

机译:为来自英国惰性废物的国家废物终止标准的制定解决方案

获取原文

摘要

The value of recovered aggregates in the UK is worth a potential ?3.9bn over the next ten years, but how does the UK unlock and realise this potential? To begin, the UK started a programme of work to develop national end-of-waste (EoW) criteria for aggregates in 2003; this deals with the production of aggregates from inert construction, demolition and excavation waste. The purpose of national level EoW criteria is to provide a uniform control process for producers, from which they can reasonably state and demonstrate that their product has been fully recovered and is no longer a waste. It also provides purchasers with a quality-managed product to common standards, which increases confidence in performance. For the period 2011 to 2020 the aggregates EoW criteria is anticipated to deliver across England, Northern Ireland and Wales; 187,723,300 tonnes of material diverted from landfill, 368,630,200 tonnes of virgin material saved, carbon(e) savings of 938,600 tonnes; accruing the potential net benefit of ?3.9bn over ten years.
机译:回收聚集在英国的价值是值得潜力?39亿,在未来十年,但如何在英国的解锁和发挥这种潜力?首先,英国开始了工作方案制定国家结束废物(EOW)于2003年聚集标准;这涉及生产从惰性建筑,拆迁和弃渣聚集体。国家一级标准,每周一次的目的是为生产者提供一个统一的控制过程,从中他们可以合理的状态,并证明他们的产品已经完全康复,不再浪费。它还提供了一个质量管理的产品共同的标准,从而提高性能的信心购买。对于到2020年聚集EOW标准预计将在整个英格兰,北爱尔兰和威尔士交付期2011; 187723300吨从填埋转移材料,368630200吨原始材料的保存,碳(e)中的938600吨积蓄;累积的?39亿的潜在净效益超过十年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号