A major operator in the North Sea had experienced a problem with damaged casing at the packer setting depth of an existing HPHT well, causing a leak into the production annulus. A workover was required, and a calliper survey conducted after retrieving the tubing showed two sizeable grooves along the longitudinal axis of the casing at 120 degrees to each other. This paper discusses the successful qualification and installation of an HPHT permanent packer for worn casing system. Permanent packers are qualified to ISO 14310 V0 in a test fixture to meet the API 5CT internal casing dimensions but do not account for any wear or damage in the casing. A test programme was developed to mimic the worn casing and HPHT well conditions and consisted of the following: 1. Install packer in 9-7/8-in casing and flow test to 3 bpm at 180aF to verify element circulation integrity 2. Test application using synthetic oil to mimic packer loading until failure, including setting, production, and hot/cold shut in.; apply 9000-psi annulus pressure to support the casing during testing. Max temperature was 423aF for over 200 hours. 3. Test modified ISO 14310 V0 at 450aF with 15000 psi differential pressure and 400,000 lbf tension and compression. The packer passed all tests with no extrusion of the three-piece multi-durometer Aflas element. The discussion will include packer design, HPHT test in worn casing, casing acceptance criteria, and lessons learned. This was the first packer test in worn casing that demonstrated compliant back-up system capability to support the entire element circumference at elevated temperatures. The packer was run and set in the HPHT well after over 3 months suspended in caesium formate.
机译:北海的主要操作员在现有HPHT的封装深度良好的封装深度处经历了一个问题,导致生产环空泄漏。在检索管道之后进行的呼叫在沿壳体的纵向轴线彼此以120度以120度的纵向轴线显示两个相当大的凹槽。本文讨论了用于磨损套管系统的HPHT永久包装机的成功验证和安装。永久包装器在测试夹具中符合ISO 14310 V0,以满足API 5CT内部套管尺寸,但不考虑套管中的任何磨损或损坏。开发了一个测试程序,以模仿磨损的壳体和HPHT条件,并由下列组成:1。在180AF下安装9-7 / 8-in 9-7 / 8-3-3 BPM的包装机以验证元素循环完整性2.测试应用使用合成油以模拟包装机加载直至发生故障,包括设置,生产和热/冷。应用9000-PSI环压力以在测试期间支撑壳体。最大温度为423AF超过200小时。 3.在450AF下测试改进的ISO 14310 V0,具有15000 PSI差压和400,000 LBF张力和压缩。包装器通过了所有测试,没有挤出三件式多硬度计AFLAS元件。讨论将包括包装器设计,磨损套管的HPHT测试,套管验收标准和经验教训。这是磨损套管中的第一个封隔器测试,其证明了柔顺的备用系统能力,以在升高的温度下支撑整个元件圆周。在悬浮在铯甲酸铯悬浮在3个月后,封装器在HPHT中进行了良好。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号