首页> 外文会议>WateReuse Symposium >IMPROVING ENERGY EFFICIENCY OF LOW SALINITY DESALINATION (WASTEWATER AND BRACKISH WATER) USING ENERGY RECOVERY DEVICE - CASE STUDIES
【24h】

IMPROVING ENERGY EFFICIENCY OF LOW SALINITY DESALINATION (WASTEWATER AND BRACKISH WATER) USING ENERGY RECOVERY DEVICE - CASE STUDIES

机译:使用能量回收装置提高低盐度脱盐(废水和薄荷水)的能效 - 案例研究

获取原文

摘要

Overview The Initial Expansion of the Groundwater Replenishment (GWR) System Project (Expansion Project) is a proposed expansion of Orange County Water District's (OCWD or District) Advanced Water Purification Facility (AWPF) located in Fountain Valley, California. This paper describes the energy recovery and reverse osmosis (RO) process optimization features of the Expansion Project. The GWR System consists of three major components: (1) the AWPF and pumping stations; (2) a transmission pipeline connecting the treatment facilities to existing recharge basins; and (3) an existing seawater intrusion barrier. The expansion will add 30 million gallons per day (mgd) to the production capacity of the AWPF. A major portion of the Expansion Project was to review existing design and operations of the RO system at the AWPF and evaluate applicability of energy recovery devices (ERDs) for the new RO units. Based on this evaluation,preliminary design criteria for the 30 mgd expansion were developed to enhance the energy efficiency and operability of the new RO units.
机译:概述地下水补货的初步扩展(GWR)系统项目(扩展项目)是古老的县水域(OCWD或地区)高级水净化设施(AWPF)的拟议扩张,位于加利福尼亚州喷泉谷。本文介绍了扩展项目的能量回收和反渗透(RO)流程优化特征。 GWR系统由三个主要组件组成:(1)AWPF和泵站; (2)将处理设施连接到现有的充电盆地的传输管道; (3)现有海水入侵屏障。扩张将每天增加3000万加仑(MGD)到AWPF的生产能力。扩展项目的主要部分是审查AWPF的RO系统的现有设计和运营,并评估能量回收设备(ERDS)对新RO单元的适用性。根据该评估,开发了30 MGD扩展的初步设计标准,以提高新RO单元的能量效率和可操作性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号