首页> 外文会议>Pipeline Pigging and Integrity Management Conference >Managing technical and logistical challenges on a deepwater gas field pipeline pre-commissioning and inspection project
【24h】

Managing technical and logistical challenges on a deepwater gas field pipeline pre-commissioning and inspection project

机译:对深水天然气场管道预调试和检验项目管理技术和后勤挑战

获取原文
获取外文期刊封面目录资料

摘要

THIS PAPER FOCUSES ON the technology and logistical challenges for a long-distance, deepwater pipeline precommissioning and inspection project. Weatherford Pipeline and Specialty Services (P&SS) performed this work on hehalf of Noble Energy Inc., a major oil and gas exploration and production company. Its subsidiary, Noble Energy Mediterranean Ltd., contracted directly with Weatherford P&SS as part of their development of a subsea gas production and transportation system connecting the deepwater Tamar Gas Field (see figure 1 below) to an offshore receiving and processing platform linked to the existing Mari-B Platform in the Mediterranean sea.
机译:本文重点介绍了长途,深水管道前置和检验项目的技术和后勤挑战。 Weatherford管道和专业服务(P&SS)在诺布尔能源Inc.的Hehalf进行了这项工作,是一家主要的石油和天然气勘探和生产公司。 它的子公司诺布尔能源地中海有限公司直接与Weatherford P&SS合同,作为他们开发的海底天然气生产和运输系统,将深水巨野天然气场(见下文)与现有的海上接收和加工平台连接在一起 Mari-B平台在地中海。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号