首页> 外文会议>IEEE IAS ELectrical Safety Workshop >From planned to unplanned shutdown
【24h】

From planned to unplanned shutdown

机译:从计划到计划的关机

获取原文

摘要

One of the considerations that must be evaluated when performing a facility wide shut down for maintenance is an outline of the utility's scope of work. It is not as simple as coordinating the shutdown date and time but also requires identification of the utility inclusions and exclusions in the scope of work. Without proper identification, it leaves a lot of unknowns during the power restoration process that can result to a bigger problem than a simple planned maintenance activity. Recognizing this, additional steps have been incorporated into the process to ensure that all potential risk are addressed and properly communicated. The paper will cover one user's experience related to the subject, the issues they encountered, and the resulting perspective that they now have related to this subject.
机译:在执行设施广泛关闭以进行维护时必须进行评估的考虑因素是实用程序范围的概要。它并不像协调关机日期和时间那么简单,而且还需要识别工作范围的公用事业夹杂物和排除。如果没有适当的识别,它会在功率恢复过程中留下很多未知数,这可能导致更大的问题而不是简单的计划维护活动。认识到这一点,已纳入过程中的其他步骤以确保解决所有潜在风险并适当地传达。本文将涵盖与主题相关的一个用户的经验,他们遇到的问题,以及他们现在与这个主题有关的结果的视角。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号