首页> 外文会议>International Seminar on Paste and Thickened Tailings >The high-density thickened discharge tailings storage facility at Osborne Mine - a case history from inception to closure
【24h】

The high-density thickened discharge tailings storage facility at Osborne Mine - a case history from inception to closure

机译:奥斯本矿山的高密度加厚排放尾矿储存设施 - 从闭包开始的案例历史

获取原文

摘要

Chinova Resources Pty Ltd's Osborne Mine is located in Northern Queensland, approximately 800 km inland from the eastern coast. It commenced operations in 1995 with the development of an open pit mine. In 1996, the operation transitioned to underground mining. In 2015, Osborne will have been in operation for 20 years and will have mined 29 Mt of ore. The site has produced 672, 420 t of copper a'nd 673,295 oz of gold.Osborne Mine produces approximately 112,000 t of tailings per month. In 2003, following progressive evaluation and development of a high-density discharge tailings management system, Osborne implemented the first of two trial depositions forming advancing cones of deposited tailings within their TSF2 site. These trials proved successful and, following successful permit applications to the regulators, TSF2 was converted to high-density thickened tailings discharge. The principal benefit of this change was in the reduction of construction costs for confining embankments. However, an additional major benefit lay in a reduction of make-up water volumes. The majority of water loss in the process water circuit occurs in the tailings system as a result of evaporation. High-density thickened discharge provides a means for significantly reducing water losses, since, by recovering and re-using more water at the thickener and in the plant, less water is discharged onto the tailings facility so there is less water available for evaporation. High-density thickened discharge also enabled a significant improvement in operating costs.High-density thickened discharge operations at Osborne have had to be continuously modified and adjusted as ores from satellite mines have been processed to supplement the diminishing Osborne Mine ore. Mineralogical influences of the supplementary ore significantly affect the thickening and beaching characteristics of the tailings slurry, particularly in the most recent operating period. However, through appropriate modifications and adjustments, the benefits of high-density thickened discharge have been retained.
机译:Chinova Resources Pty Ltd的奥斯本矿山位于昆士兰北部,内陆约有800公里。它于1995年开始开展业务随着开放式坑洼。 1996年,该行动转型为地下采矿。 2015年,奥斯本将在运行20年,并将开采29吨矿石。该网站已生产672,420吨铜A'nd 673,295盎司的金。索勒斯矿产每月约112,000吨尾矿。 2003年,在逐步评估和开发高密度放电尾矿管理系统之后,奥斯本实施了两种试验沉积中的第一个,形成了TSF2位点内的沉积尾矿的推进锥体。这些试验证明是成功的,并且在成功的允许申请到调节器后,将TSF2转化为高密度加厚的尾矿放电。这一变化的主要好处是减少限制堤的建设成本。然而,额外的主要益处奠定了减少化妆水量。工艺水路中的大部分水分流失在尾矿系统中发生在尾矿系统中。高密度加厚的排放提供了一种显着降低水损失的方法,因为通过在增稠剂和植物中回收更多的水,较少的水被排放到尾矿设施上,因此可用于蒸发的水较少。高密度加厚的放电也能够显着提高运营成本。奥斯本的高密度增厚的放电操作必须连续修饰和调整,因为从卫星矿山加工,以补充疏忽的奥斯本矿山矿石。补充矿石的矿物学影响显着影响尾矿浆料的增稠和搁浅特性,特别是在最近的运行期间。然而,通过适当的修改和调整,已经保留了高密度增厚的放电的益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号