Dry stacking of cyclone tailings

机译:干燥堆叠旋风尾矿

获取原文

摘要

Mining companies have been facing a challenging time safely disposing of tailings. The most common disposal technique, the disposal of total tailings in conventional impoundments, requires large surface areas and has a major impact on the environment. Therefore, the adoption of alternative and more cost effective disposal techniques is being sought by mining companies all over the world. This paper demonstrates an alternative method for disposing of cycloned tailings. The method was developed at the Serra Azul Mine, owned by ArcelorMittal Mineracao Serra Azul S/A, at a site with limited space to accommodate a conventional tailings dam, and where difficulties exist in obtaining environmental licenses for traditional disposal. The project designers envisioned construction of a dry stack of tailings in several levels confined in small 'ponds.' The ponds are built with cyclone underflow, which acts as a drainage blanket. The interior of the ponds is built with alternate layers (0.5 m thick layers) of cyclone overflow and underflow material, using trucks. The overflow is first taken to an area to lose its high moisture content and then taken to the pond. After that, the alternate disposal is carried out. To minimise erosion, the downstream face of the stack is covered with coarser tailings, obtained from jigging. The starter dike is built with rockfill to increase the overall stability of the tailings stack. A pilot test was conducted, along with field and laboratory characterisation of the tailings. Both limit-equilibrium stability analyses and numerical analyses were carried out to verify the safety of the structure, which will be 70 m high, with an overall slope angle of 18° in its final configuration. The result of these geotechnical analyses is that the settlement will not affect the stability of the structure. This tailings disposal method entails lower risk and fewer space requirements compared to conventional methods. Even though this alternative represents a higher cost due to intensive handling of tailings, it has allowed the mining operation to maintain its regular schedule.
机译:矿业公司一直面临着安全地处理尾矿的挑战时间。最常见的处置技术,常规蓄水中的总尾矿处置需要大的表面积,对环境产生重大影响。因此,正在通过世界各地的矿业公司寻求替代和更具成本效益的处置技术。本文展示了处理循环尾矿的替代方法。该方法是在Serra Azul Lime开发的,由arcelormittal Mineracao Serra Azul S / A拥有,在有限的空间,以适应传统的尾矿大坝,并且在获得传统处置的环境许可证中存在困难。该项目设计人员设想在小“池塘的几个层次内的尾矿堆叠的建造。”池塘采用飓风底部制造,它充当排水毯。使用卡车,池塘内部采用旋风溢流和下溢材料的替代层(0.5米厚的层)构建。溢出首先被占地面积,以减少其高水分含量,然后拿到池塘。之后,进行交替的处置。为了最大限度地减少侵蚀,堆叠的下游面覆盖着从竖起的粗糙尾矿覆盖。首发堤防采用岩石建造,以提高尾矿堆的整体稳定性。进行试验试验,以及尾矿的场和实验室表征。进行了限制平衡稳定性分析和数值分析,以验证结构的安全性,该结构将为70米,其最终配置中的总倾斜角为18°。这些岩土基础分析的结果是该沉降不会影响结构的稳定性。与传统方法相比,这种尾矿处理方法需要较低的风险和更少的空间要求。尽管这种替代方案由于尾矿的密集处理而代表较高的成本,但它允许采矿操作维持其规则的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号