首页> 外文会议>International Seminar on Paste and Thickened Tailings >Paste and thickened tailings - myth busting and clarification
【24h】

Paste and thickened tailings - myth busting and clarification

机译:粘贴和加厚的尾矿 - 神话破坏和澄清

获取原文

摘要

It is the contention of this paper that there remains considerable confusion regarding the mechanisms and benefits of thickened tailings schemes. The terminology and interpretation of terms like 'thickened tailings' and 'paste' receive some consideration, in light of some observed contradiction in the industry. It is also noted that a number of tailings related misconceptions prevail amongst tailings practitioners. This paper attempts to clarify some of these issues, with the intention of dispelling some tailings myths. The subject of tailings beach slope prediction is one particular topic that deserves some consideration in the interests of clarity. A large portion of this paper is devoted to this topic, which has been approached from a number of directions over the past 40 years. Various prediction methods have been presented. Some prediction methods are analytical, with no need for any flume testing. Others have relied on a deposition test in a flume. The use of different types of flumes and deposition tests, either for providing validating data or input data, has created a great deal of confusion over what works and what does not, what is relevant and what is not. There has also been further confusion created by the presentation of the results, with some workers presenting fitted data as predictions. This paper discusses the mechanism of tailings deposition, with a view to evaluating the applicability of some of the approaches that have been presented. Various flume types and their relevance to the process are then discussed. Deposition tests and trials are also discussed in terms of the beach slopes that have been observed. Finally, some protocols are proposed for making the presentation of data more consistent and transparent.
机译:本文的争论是对增厚尾矿计划的机制和益处仍然相当大的混乱。术语和解释术语,如“加厚尾矿”和“粘贴”,鉴于行业的一些观察到的矛盾,会受到一些考虑。还有人指出,尾矿从业者之间存在许多尾矿相关的误解。本文试图澄清一些问题,意图分散一些尾矿神话。尾矿海滩坡预测的主题是一个特定的主题,以阐明清晰的兴趣值得考虑。本文的大部分致力于本主题,这已经从过去40年的一些方向接近。已经提出了各种预测方法。一些预测方法是分析的,无需任何水槽测试。其他人依赖于水槽中的沉积试验。使用不同类型的FLUMES和沉积测试,用于提供验证数据或输入数据,它创造了对什么有效的大量混淆,而不是什么是相关的,什么不是。展示结果也有进一步的混乱,其中一些工人将拟合数据作为预测呈现。本文讨论了尾矿沉积机制,以评估一些已经提出的方法的适用性。然后讨论各种水槽类型及其与该过程的相关性。还在观察到的海滩斜坡方面讨论了沉积试验和试验。最后,提出了一些协议,用于使数据呈现更加一致和透明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号