Case Study: Comparison of Net Operational Costs and NPV of Project Investment Between HCSD and LCSD

机译:案例研究:HCSD和LCSD项目投资净运营成本和NPV的比较

获取原文

摘要

Park Elektrik Turkey, a Turkish copper producer, had a requirement for an alternative solution for their tailings storage facility that was approaching its maximum capacity. A further increase of the dam height and associated capacity of the existing tailings facility was not feasible. At that time the plant was operating a lean concentration slurry disposal (LCSD) system.It was decided to construct a new tailings storage facility, but instead of selecting a LCSD system a high concentrated slurry disposal (HCSD) system was selected, also referred to as thickened tailings disposal. With this design, a sloped and stable disposal area is formed as the majority of liquid evaporates from the slurry. In addition, the amount of liquid required for transportation is reduced, power consumption per dry ton of deposited tailings is decreased and environmental risks are minimized. This case study, conducted in cooperation with Park Elektrik, compares the two alternative tailings disposal systems, HCSD and LCSD, with a focus on financial impacts. Included in the financial comparison is the complete tailings disposal system, including thickener, pumping system and disposal area. Although the concept of HCSD requires a higher investment for slurry preparation and pumping equipment when compared to LCSD, the net cost per dry ton of deposited tailings proves to be substantially lower. The financial analysis demonstrates a payback time of 1.9 years justifying the initial higher investment for a project with a 15 year life. Factors such as mine closure, rehabilitation and long-term liability have not been included in the financial analysis as presented, but it is believed that including these would create an even stronger case for the HCSD approach.
机译:Park Elektrik Turkey是一家土耳其铜生产国,要求替代解决其尾矿储存设施的替代解决方案,即接近其最大容量。水坝高度和现有尾矿设施的相关容量的进一步增加是不可行的。当时,该植物正在操作瘦浓度浆料处理(LCSD)系统。决定构建新的尾矿储存设施,但是选择LCSD系统,选择了高浓缩浆料处理(HCSD)系统,也提到了作为增厚的尾矿处理。通过这种设计,形成倾斜和稳定的处理区域,因为大部分液体从浆料中蒸发。另外,减少了运输所需的液体量,减少了每吨沉积尾矿的功率消耗,并且环境风险最小化。与Park Elektrik合作进行的这种情况研究比较了两种替代尾矿处理系统,HCSD和LCSD,重点是财务影响。金融比较包括完整的尾矿处理系统,包括增稠剂,泵送系统和处置区域。尽管与LCSD相比,HCSD的概念需要对浆料制备和泵送设备进行更高的浆料制备和泵送设备,但每吨沉积尾矿的净成本证明基本上更低。财务分析表明回报时间为1.9年,为一个带有15年生命的项目的初始投资证明了最初的投资。矿井关闭,康复和长期责任等因素尚未列入所提出的财务分析,但据信包括这些案例为HCSD方法创造了一个更强大的案例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号