首页> 外文会议>Mary Kay O'Connor Process Safety Center Symposium >API RP 752 Building Siting Using F-N curves
【24h】

API RP 752 Building Siting Using F-N curves

机译:API RP 752使用F-N曲线建造选址

获取原文

摘要

An explosion overpressure analysis is a routine part of compliance with the American Petroleum Institute (API) Recommended Practice (RP) 752 and 753. A basic consequence analysis often attempts to demonstrate a few scenarios that may appear to have the most extreme consequences; however, these scenarios may also have extremely low likelihoods of occurrence. To have a better understanding of how likely as well as how extreme a consequence may be, risk-based analysis is often required. One method used for this is an overpressure exceedance analysis which uses overpressure results from many potential explosion scenarios coupled with the probability of each scenario. Using only peak overpressure to predict building damage as well as potential injury only accounts for half of the effects of an explosion. Pressure-Impulse curves can make better use of the explosion model's outputs (pressure and impulse) in order to predict building damage and possible injury of personnel. Using this type of analysis with a building damage-fatality relationship, an F-N style curve can be created which shows the cumulative frequency vs. the number of potential fatalities. This paper will discuss the method used to produce these curves, as well as the benefits and potential problems with this type of analysis.
机译:爆炸过压分析是遵守美国石油研究所(API)推荐实践(RP)752和753的常规部分。基本后果分析通常试图展示一些可能似乎具有最极端后果的情景;然而,这些场景也可能具有极低的发生可能性。为了更好地理解可能是多么极端的可能性,通常需要基于风险的分析。用于此的一种方法是过压超标分析,其使用来自许多潜在爆炸场景的超压以及与每个场景的概率相结合的。仅使用峰值超压预测建筑物损坏以及潜在的伤害仅占爆炸效果的一半。压力 - 脉冲曲线可以更好地利用爆炸模型的输出(压力和冲动),以预测建立损坏和人员可能伤害。使用这种类型的分析与建筑物伤害死亡关系,可以创建F-N样式曲线,其显示累积频率与潜在死亡的数量。本文将讨论用于生产这些曲线的方法,以及这种类型的分析的益处和潜在问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号