Design of Uranium Mill Facility Liner Systems for the Pi?on Ridge Project

机译:PI铀磨机衬里系统的设计?在山脊项目上

获取原文

摘要

The regulatory environment regarding the processing of uranium ore was altered dramatically in 1992 as a result of major federal regulatory changes, making achieving regulatory compliance a greater challenge for a new facility. One major modification to the regulations is identification of prescriptive liner systems for surface impoundments (i.e., tailings cells and evaporation ponds). Strategically located within the Uravan Mineral Belt District, the Pi?on Ridge Project is the first new uranium mill being proposed for construction in the United States in over 25 years. Proposed as a 6.3 million tonne uranium milling operation, the mill will receive uranium ore from a variety of sources. The project includes design and permitting of three 12.3-hectare tailings cells, 16.2 hectares of evaporation ponds, and an ore stockpile pad. This paper will focus on the liner system requirements and designs for the various facilities.
机译:关于铀矿加工的监管环境在1992年由于主要的联邦监管改变而发生了显着改变,使监管合规性对新设施进行更大的挑战。对规定的一个主要修改是识别用于表面蓄水量的规定衬垫系统(即尾矿细胞和蒸发池)。战略性地位于Uravan矿物腰带区,PI仓库(PI)是山脊项目,是第一个新的铀磨坊在25年内在美国建设建设。提出为630万吨铀碾磨操作,磨机将从各种来源接受铀矿石。该项目包括设计和允许三个12.3公顷的尾矿细胞,16.2公顷的蒸发池和矿石储存垫。本文将专注于各种设施的衬里系统要求和设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号