首页> 外文会议>Middle East Oil Gas Show and Conference >Offshore Pipeline Precommissioning Operations Using Coil Tubing Units
【24h】

Offshore Pipeline Precommissioning Operations Using Coil Tubing Units

机译:使用线圈管单元的海上管道前置操作

获取原文

摘要

Coil Tubing has been used in many oilfield applications worldwide both offshore and onshore, upstream and recently downstream. Apart from upstream coil tubing applications such as workovers, well interventions, paraffin/scale removal, jetting, acidizing and coil fracturing, it is employed more and more actively for pipelines precommissioning operations subsea, especially dewatering. With a slight modification (there is no need in Blowout Prevention (BOP) System in this case) the coil tubing unit is positioned on a vessel’s deck and connected to compressors spread injecting pressurized air down the coil tubing string to the hot stab connection of the pipeline to be dewatered. Pressure drops across the tubing string and other connections and flow patterns can be simulated using proprietary software CIRCA. For the deep offshore applications high pressure boosters are often employed.
机译:线圈管已在许多油田应用中使用,全世界在海上和陆上,上游和最近下游。除了上游线圈管道应用,如营业效果,干预措施,石蜡/尺度去除,喷射,酸化和线圈压裂,它越来越积极地用于管道前进的行动海底,尤其是脱水。随着微小的修改(在这种情况下,在井喷(BOP)系统中没有必要)线圈管单元定位在容器的甲板上,并连接到压缩机,将管线管柱向下喷射加压空气向热刺到热刺痛的甲板上。管道要脱水。可以使用电流大道模拟管道串和其他连接和流动模式的压力下降。对于深层海外应用,通常采用高压助推器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号