Record Coiled Tubing Aided Reach and First Real-Time Injection Profiling with Tractor in Extended Reach Well

机译:记录盘绕管道辅助达到和首先使用拖拉机的实时注射率延长井

获取原文

摘要

To enhance well performance intervention work is often necessary in field developments. Challenges exist in vertical well interventions and these have been studied and improved over the years. However, horizontal well interventions pose a completely new challenge and a magnified level of difficulty. With extended reach wells certain challenges become almost insurmountable. Basic data acquisition such as production logging where profile data flow is acquired becomes almost impossible to acquire. Yet, this data is vital for decision making. While tractor aided coiled tubing has largely been demonstrated as a preferred deployment technique for cost-effective production logging and acid stimulation combined operations, most of the initial jobs where accomplished via memory production logging in these extended reach wells. This was because the Coiled tubing tractor had no inner wiring. This led to a situation where the subjects of real time evaluation of production flow profile, treatment effectiveness, and injection zone monitoring have remained an industry challenge. A hydraulic tractor aided coiled tubing intervention was introduced as a solution for the development of the extended reach wells in a Saudi field three years ago. This solution aided in the acquisition of the previously difficult data and in addition, aided in deduction of the specific stimulation benefits such as damage skin reduction, improved drawdown, and treatment gains from injectivity increase. Some records which were also set while achieving the well's intervention objectives include 1) attaining the deepest coiled tubing (CT) reach at 29,897 feet (9.11 km) in an extended reach open hole horizontal injector well using a tractor and 2) the first application of real-time water injection profiling enabled through a wired motor head assembly via the tractor. In addition to data, other operational benefits include less equipment to the well site because the same equipment was used for both production logging and stimulation – in particular the coiled tubing reel, amongst others. The application of real-time informed decisions was critical in overcoming challenges affecting spinner response, operating time and cost, optimizing stimulation design, and yielding a consistent injectivity increase with a true reflection of deep penetration into the damage zone will benefit operators confronting similar intervention challenges.
机译:为了提高井的性能干预工作,通常是现场发展所必需的。在垂直井干预中存在挑战,多年来已经研究过这些挑战。然而,水平井干预措施构成了全新的挑战和放大的难度。随着延长速度的良好良好的某些挑战几乎是不可克服的。基本数据采集,如生产记录,其中获取简档数据流的基本数据变得几乎不可能获取。然而,这种数据对于决策至关重要。虽然拖拉机辅助盘绕的管道在很大程度上被证明为具有成本效益的生产测井和酸刺激组合操作的优选部署技术,但大多数通过这些扩展到井中的内存生产测井完成的大多数初始工作。这是因为盘管拖拉机没有内部布线。这导致了生产流程曲线,治疗效果和注射区监测实时评估的主题仍然是行业挑战。液压拖拉机辅助卷绕管干预被引入了三年前沙特领域延长井的发展的解决方案。该解决方案在获取先前困难的数据中,另外,辅助扣除特定的刺激益处,如损伤皮肤减少,改进的缩减和治疗从注射率增加增加。在实现井的干预目标的同时设置的一些记录包括1)在延伸到达开放孔水平注射器的井中的井中和2)的第一次应用中,达到最深的卷绕管(CT)达到29,897英尺(CT)达到的最深通过拖拉机通过有线电动机头组件实现实时注水分析。除数据外,其他操作效益还包括较低的设备到井场,因为相同的设备用于生产测井和刺激 - 特别是卷绕管卷轴,其中包括其他设备。实时明智决策的应用对于克服旋转器反应,操作时间和成本,优化刺激设计的挑战至关重要,并产生一致的重新注入,并对损伤区的深度渗透反映将受益于相应的干预挑战挑战的运营商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号